Principal Investigator:Johnson, Pascale Licensed Year(s):2006
2005
200420032002 Summary:
The Pointed Mountain Gas Plant, six associated wellsites, and the airstrip are being assessed during the decommissioning process. The site was initially constructed in 1966. The plant has been shut down since September 2001. The Pointed Mountain field has had soil, groundwater, and surface water assessed since 1990. Previous environmental work and public consultation at this site have identifi...
Principal Investigator:Povey, Andrew Licensed Year(s):
2004
20032002 Summary:
Imperial Oil Resources Ventures Limited, Aboriginal Pipeline Group, ConocoPhillips Canada (North) Limited, Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. Local k...
Principal Investigator:Graburn, Larry Licensed Year(s):
2003
Summary:
The proposed activities form part of a Summer Field Geotechnical Investigation Program to be conducted in the Deh Cho Region during 2003. The objective of this program is to gather information that will assess the soil and ground conditions at a represe...
Principal Investigator:Miller, Samantha Licensed Year(s):
2003
Summary:
The objectives of this assessment are to conduct a site investigation to evaluate potential environmental impact associated with daily facility operations associated with the O-35 wellsite. In August 2002, an Environmental Site Assessment was conducted....
Principal Investigator:Miller, Samantha Licensed Year(s):
2003
Summary:
The objectives of this assessment are to conduct a site investigation to evaluate potential environmental impact associated with daily facility operations associated with the N-01 wellsite and to set up background concentrations of parameters for the lea...
Principal Investigator:Miller, Samantha Licensed Year(s):
2003
2002 Summary:
The objectives of this assessment are to conduct a soil investigation and remediation associated with the flare stack at the Paramount Resources Ltd. F-36 Wellsite. In August 2002, a modified Phase II Environmental Site Assessment was conducted. The bas...
Principal Investigator:Buckland, Laurie L Licensed Year(s):
2003
Summary:
The field studies are required to obtain specific environmental information for the study area and will be used in the preparation of baseline and environmental impact assessment reports in support of regulatory approvals. The study area is a 5 km wide...
Principal Investigator:Ferguson, Gordon Licensed Year(s):
2003
2002 Summary:
This monitoring program is designed to monitor water quality in the Liard pipeline study area and to assess reclamation success and identify areas of concern regarding revegetation and soil loss by erosion. A total of 8 permanent sampling transects were...