15 record(s) found in the location "Dehcho Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2006 Traditional Knowledge Study Follow-up Activities with the Fort Simpson Metis
Principal Investigator: Martin, Sandy D
Licensed Year(s): 2006
Summary: The Mackenzie Gas Project has sub-contracted the Fort Simpson Metis to collect and document Traditional Knowledge during the project. Local knowledge and technical/scientific research, in combination with a synthesis of existing technical information, is being used to develop a suitable knowledge base for planning, assessment of impacts and development of environmental protection plans. The Fort S...


2006 Traditional Knowledge Studies with the Katlodeeche First Nation
Principal Investigator: Martin, Sandy D
Licensed Year(s): 2006
Summary: The 2006 Traditional Knowledge Studies mark a continuation of Traditional Knowledge work initiated, as part of the Mackenzie Gas Project, with Katlodeeche First Nation in 2005. Local knowledge and technical/scientific research, in combination with a synthesis of existing technical information, is being used to develop a suitable knowledge base for planning, assessment of impacts and development of...


Phase II Environmental Site Assessment at Pointed Mountain Gas Plant and Associated Facilities
Principal Investigator: Stone, Larry
Licensed Year(s): 2006 2005 2004 2003 2002
Summary: The Pointed Mountain Gas Plant, four associated wellsites, and some associated infrastructure are being decommissioned. The site was originally constructed in 1966 and has been shut down since September 2001. Previous environmental work and public consul...


Supplemental Phase II Environmental Site Assessment, N-01 Wellsite
Principal Investigator: Kustan, Ed
Licensed Year(s): 2005 2004
Summary: The purpose of this work is to undertake an environmental assessment of the wellsite and associated facilities. The environmental assessment of the wellsite and associated facilities may include; a walk around the lease area; identification of additional...


Modified Phase II Environmental Site Assessment O-35 Wellsite
Principal Investigator: Miller, Samantha
Licensed Year(s): 2003
Summary: The objectives of this assessment are to conduct a site investigation to evaluate potential environmental impact associated with daily facility operations associated with the O-35 wellsite. In August 2002, an Environmental Site Assessment was conducted....


Modified Phase II Environmental Site Assessment N-01 Wellsite
Principal Investigator: Miller, Samantha
Licensed Year(s): 2003
Summary: The objectives of this assessment are to conduct a site investigation to evaluate potential environmental impact associated with daily facility operations associated with the N-01 wellsite and to set up background concentrations of parameters for the lea...


Modified Phase II-III Environmental Site Assessment F-36 Wellsite
Principal Investigator: Miller, Samantha
Licensed Year(s): 2003 2002
Summary: The objectives of this assessment are to conduct a soil investigation and remediation associated with the flare stack at the Paramount Resources Ltd. F-36 Wellsite. In August 2002, a modified Phase II Environmental Site Assessment was conducted. The bas...


2003 Field Reconnaissance - Deh Cho Region
Principal Investigator: Graburn, Larry
Licensed Year(s): 2004 2003
Summary: The objective of this field reconnaissance program is to conduct preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, watercourse crossings, water sources for ice road construction and potential cam...


Post Construction Water Quality Monitoring and Revegetation and Soil Monitoring for the Liard Pipeline and Gathering Project, Fort Liard, NT and Maxhamish Area, BC
Principal Investigator: Ferguson, Gordon
Licensed Year(s): 2003 2002
Summary: This monitoring program is designed to monitor water quality in the Liard pipeline study area and to assess reclamation success and identify areas of concern regarding revegetation and soil loss by erosion. A total of 8 permanent sampling transects were...


Environmental Assessment for the Fort Liard Area Seismic, Drilling and Development Project, Fort Liard, NT.
Principal Investigator: Antoine, Don
Licensed Year(s): 2001
Summary: Nahendeh Land and Environmental Services proposes to conduct baseline studies on behalf of Anadarko Canada Corporation, to determine the presence or absence of fish and wildlife habitat in the vicinity of the proposed project. The wildlife program will consist of a literature review, which would document any information on wildlife populations in the general project area, and identify any data ga...


TOTAL PAGES: 2