12 record(s) found in the location "Dehcho Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Canadian Northern Corridor Community Engagement Program
Principal Investigator: Winter, Jennifer
Licensed Year(s): 2022
Summary: This licence has been issued for the scientific research application No.5281. The key objective of the Community Engagement Program is to hear about and document resident and community perspectives on local and regional socioeconomic priorities, concerns, and goals in the context of existing, planned, and potential infrastructure development in the territory. This will provide decision makers a...


Fish Habitat and Hydrotechnical Assessments along the Proposed Mackenzie Valley Highway
Principal Investigator: Chiperzak, Doug
Licensed Year(s): 2021
Summary: This licence has been issued for the scientific research application No.5060. The goal is to collect baseline fish, fish habitat and hydrotechnical data for selected watercourses along the proposed Mackenzie Valley Highway to support engineering design and the regulatory process. Fish habitat will be assessed along 100 m reaches upstream and downstream of each potential watercourse crossing....


Aquatic Baseline Studies in Support of Mackenzie Valley Highway
Principal Investigator: Chiperzak, Doug
Licensed Year(s): 2020
Summary: This licence has been issued for the scientific research application No.4822. The goal is to collect baseline fish and fish habitat data for two sections of the proposed Mackenzie Valley Highway; Prohibition Creek Access Road (PCAR) and Mount Gadet Access Road (MGAR). Data collected will support engineering design and regulatory process to construct these segments of the highway. A desktop s...


2003 Traditional Knowledge and Socio-Economic Studies in the Deh Cho Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2003 2002
Summary: This project is a continuation of socio-economic and traditional knowledge studies in the Deh Cho Region, which were initiated in 2002 as part of the baseline studies and assessment for the Mackenzie Gas Project. The primary focus of the socio-economic...


2002 Socio-Economic Studies in the Deh Cho Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2002
Summary:No summary information is available for this licence.


Active layer monitoring network in the Mackenzie Valley
Principal Investigator: Nixon, Mark
Licensed Year(s): 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992 1991 1990
Summary: This season, a party of two will survey tubes between North Richards Island and Tsiigehtchic during April and from Fort Simpson to the Arctic Coast in July and August. Travel will be by road, small boat on the river and helicopter from Norman Wells and Tutoyaktuk. Access to the sites is always on foot. This year is the seventh annual survey of a network of thaw depth measuring devices (thaw tub...


Planning study of Northern Native Communities
Principal Investigator: Pin, Gino
Licensed Year(s): 1996
Summary: Will conduct community consultation workshops in the 4 case study communities: Rae-Edzo, Snare Lake, Ft. Resolution and Kakisa. The workshops will open to the entire community. Data collection will be by open meeting discussion, individual interviews and interactive activity stations. The study is an evaluation of the level of success of existing planning and housing practice for native communi...


Northern River Ice Regimes
Principal Investigator: Sherstone, David A.
Licensed Year(s): 1993 1992 1991 1990 1988
Summary: Simple, inexpensive ice thickness gauges are installed on river channel ice. Usually 3-4 gauges per channel. Twenty gauges are installed in the Mackenzie Delta and 12 in Hay River. Every 10 days the gauges are read to obtain the total ice,white ice and snow quantities at each site. From this data the rates of ice growth and decay can be calculated and the approximate date at which the ice will...


Licence #2396
Principal Investigator: McLaughlin, Ronald
Licensed Year(s): 1978
Summary: To study the effect linear developments (roads, pipelines and seismic lines) have on the northern ecosystems by: (1) documenting changes to the vegetation and terrain and comparing these areas with undistrubed areas. (2) selecting vegetation sample sites for next year's program. (3) sampling fish, small aquatic organisms ...


Licence #2135
Principal Investigator: McKinnon, G.
Licensed Year(s): 1977
Summary: To assess the short and long term effects of highway construction on the aquatic resources of three streams....


TOTAL PAGES: 2