Principal Investigator:Wiatzka, Gerd M Licensed Year(s):
2009
Summary:
The Rayrock Mine site has been previously remediated, but additional assessment work is proposed to ensure that the remedial efforts were effective, complete, and in good condition. INAC has contracted SENES to complete a Supplementary Site Assessment, the results of which will be used to determine if there are any residual risks associated with the site and identify options to mitigate those ris...
Principal Investigator:Wiatzka, Gerd M Licensed Year(s):
2007
2006 Summary:
The project objectives include the collection of information and samples to characterize the environmental conditions at the sites. The types of samples to be collected include: water (8 samples), sediment (5 samples), soil/tailings/waste rock (5 samples) and designated substances (e.g., asbestos, lead paint, PCBs, hydrocarbons).
The work involves manual sampling and measurement with minimal d...
Principal Investigator:Wiatzka, Gerd M Licensed Year(s):20092008
2007
20062005 Summary:
The project objectives include the collection of information and samples to characterize the environmental conditions at the sites. The types of samples to be collected at each of the three sites include: water (approximately 12 samples), sediment (approximately 6 samples).
The work involves manual sampling and measurement with minimal disturbance of field conditions. No heavy equipment or dril...