26 record(s) found with the tag "water level" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2002 Aquatic Studies in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Gwich'in Settlement Area. All aquatic studies will be conducted by three or four-person crews. Each crew will include a local researcher or Renewable Resource Council (RRC) representative. Depending upon accessibility, sites will b...


2002 Aquatic Studies: Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Sahtu Settlement Area. Surveys of fish and fish habitat will be made at 62 permanently flowing watercourses, as well as 15 intermittent streams. These studies will include hydrology and water quality work as well. All of the aquatic ...


Monitoring Water Levels in the Slave River Delta, NWT
Principal Investigator: English, Michael C
Licensed Year(s): 2001
Summary: The research team will be based in Ft. Resolution. Transportation includes aircraft from Toronto to Edmonton to Hay River. Transportation in the field will be by truck and boat. The research team will operate from a base camp previously established on Steamboat Channel (a camp we originally established in 1977 when this work originally started). Water level recorders will be established at six sit...


2001 Fish Habitat Assessments for Future Mine Road Developments
Principal Investigator: Moore, Peter
Licensed Year(s): 2001
Summary: Fish will be collected and released live using seining and electro-fishing techniques. Data collection will also include flow monitoring. All assessments will be completed on watercourses within the Misery Road, Sable Lake Road and Fox Lake Road developments within the mine site. BHP will provide support staff which will include people hired locally....


Environmental Assessment for Proposed Oil and Gas Development Activities in the Gwich'in Region, NWT.
Principal Investigator: Melton, Derek
Licensed Year(s): 2002 2000
Summary: Researchers will assess fish habitat (by documenting the potential of waterbodies) and to determine the presence or absense of wildlife in the vicinity of the proposed project. A search for registered archaelogical sites within the proposed area will also be undertaken. Information from these studies will form part of an environmental assessment for the proposed project. Researchers will access...


Snare River Aqautic Study
Principal Investigator: Grabke, Dan
Licensed Year(s): 2000
Summary: In 1999, the Northwest Territories Power Corporation was awarded a 25 year water licence to operate its three hydroelectric plants on the Snare River. Conditions of this water licence included that two studies be done by the Corporation. The first study is an assessment addressing the removal of minimum flow requirements on two of the dams. This study will include a current assessment of fish a...


Channel Morphology Studies: Slave River Delta
Principal Investigator: English, Michael C
Licensed Year(s): 2000 1996 1995
Summary: The field crew will live on the delta for approximately 8-9 weeks at a site established by the principal investigator in 1997 on Steamboat Channel. Transportation will be by boat. Three channels will be studied in detail. At each study site the researchers will measure the speed of the flow using an electronic velocity meter, measure the cross sectional profile of the channel with tape and rod ...


Site Instrumentation at the Langley Drill Site
Principal Investigator: Webb, R.
Licensed Year(s): 1993
Summary: The purpose of this research is to place automated instruments to measure the wind, temperature, water levels and wave height and frequency at or near a planned drill site for Shell Canada. These instruments will be installed and monitored during our visit to the site and then the instruments will be left to collect data until they are picked up on September 15, 1993. Bird movements and their ha...


Hydrological modelling for a permafrost site and arctic snow accumulation and melt.
Principal Investigator: Woo, Ming-ko
Licensed Year(s): 1994 1993
Summary: The study attempts to find out how permafrost affects the groundwater, streamflow and levels of water in wetlands. Measurements such as soil moisture, rainfall, ground and air temperatures, and water level will be taken. This research may help to determine the effect of climatic warming on permafrost and water bodies in the arctic....


Mackenzie Delta Hydrology and Ecosystem Interactions
Principal Investigator: Marsh, Philip
Licensed Year(s): 1993 1992 1991
Summary: The research will study changes in the water levels of a variety of lakes in the Mackenzie Delta. Investigations will include consideration of factors controlling the lake levels, introduction of floodwater from the Mackenzie River, rainfall on to the lake, smowmelt runoff into the lakes and evaporation from the lakes....


TOTAL PAGES: 3