De Beers Canada Snap Lake Mine Environmental Monitoring 2021
Principal Investigator: McLean, Sarah C
Licensed Year(s): 2021
Summary: This licence has been issued for the scientific research application No.4858. The objective of the project is to conduct environmental monitoring of wildlife (incidental observations only), vegetation, air quality, hydrology, and aquatics in the Snap Lake study area. Methods used are outlined in the management and monitoring plans (aquatic effects monitoring program, water management plan [s...


Ekati Engineering and Environmental Monitoring Programs
Principal Investigator: Pacholski, Laura J
Licensed Year(s): 2020
Summary: This licence has been issued for the scientific research application No.4671. The main objectives of the field work for 2020 will be: 1) to determine if the Ekati Diamond Mine is having an effect on the surrounding aquatic environment, wildlife, and air quality; and 2) to provide baseline data for areas where mine development may occur in the future. In winter, water samples will be collect...


NTPC Bluefish Hydro Repairs
Principal Investigator: Panayi, Damian
Licensed Year(s): 2018 2017 2016 2015 2014 2013 2012 2011 2010
Summary: The objective is to describe the aquatic environment in the Yellowknife River between Bluefish Lake and Prosperous Lake as per the Fisheries Authorization and the Water Licence. This may include investigating aquatic vegetation, water quality and quantity, benthic invertebrates, fish and substrate. The results will be used to determine the most suitable means of fish habitat compensation or produc...


Stream Crossing Assessment of Select Watercourses along the Inuvik to Tuktoyaktuk Highway Alignment and Rare Plant Survey of Select Borrow Sources
Principal Investigator: Stevens, Jim
Licensed Year(s): 2013
Summary: The purpose of this study is to complete a stream crossing assessment and rare plant survey. STREAM CROSSING ASSESSMENT At each watercourse crossing site (n=12), a fish habitat assessment will be conducted from 300 m downstream to 100m upstream. Watercourses will be accessed via helicopter. The following data will be collected at each watercourse crossings site: • Six transects will be estab...


Ecological Assessment Field Work for Lue Túé Sulái (the Five Fish Lakes) Candidate Cultural Conservation Area
Principal Investigator: Haas, Claudia A
Licensed Year(s): 2012 2011
Summary: This project is to fill gaps in ecological information on a Candidate Protected Area while it makes its way through the NWT Protected Areas Strategy (PAS) process. This information will be used by the working group to make recommendations on final boundary and management planning for the area. The study will be done at the same time as a study on mercury in fish being conducted by the Dehcho F...


Environmental Surveys of the Fortune Minerals NICO Project
Principal Investigator: Goad, Robin E
Licensed Year(s): 2017 2016 2014 2013 2012 2011 2010 2009 2008 2006 2005 2004 2003
Summary: The scope of environmental studies to be undertaken includes fish and fish habitat, water quality, air quality, and vegetation surveys. Equipment for habitat surveys will be limited to standard field measuring and surveying equipment, such as GPS units, and helicopters. An automated meteorological station has been set up to collect weather data. A summer and fall fish and fish habitat survey w...


Environmental Studies for the Proposed Parsons Lake Development Area During Summer and Fall 2006
Principal Investigator: Graf, Linda H
Licensed Year(s): 2007 2006
Summary: The anticipated studies include lake bathymetry, fish and fish habitat, and vegetation studies. Measurements of lake depths, surface area and other bathymetric features will determine lakes suitable for water withdrawal during the proposed construction phase of the winter access roads. Bathymetry work will be conducted with a digital echo-sounder linked to a GPS and other supporting equipment. Lak...


Taltson Hydro Project; Expansion Baseline Studies and Water Effects Monitoring Program
Principal Investigator: Uren, Shane
Licensed Year(s): 2004
Summary: The Expansion Project proposes to supply power to the Snap Lake, Gahcho Kue, Diavik and EKATI mine sites by expanding the existing infrastructure at the facilities on the Taltson River at Twin Gorges and at Nonacho Lake. Studies characterizing baseline e...


Environmental Studies for Anadarko Canada Energy Ltd.'s Proposed East Liard Gas Gathering System
Principal Investigator: Buckland, Laurie L
Licensed Year(s): 2003
Summary: The field studies are required to obtain specific environmental information for the study area and will be used in the preparation of baseline and environmental impact assessment reports in support of regulatory approvals. The study area is a 5 km wide...


Environmental Survey for EnCana ECA et al Begadeh Exploratory Wellsite Project
Principal Investigator: Newyar, Chuck
Licensed Year(s): 2003
Summary: This survey is required to obtain specific environmental information to be used in support of land use permit and water licence applications for EnCana's proposed winter drilling program within the Tulita District of the Sahtu Settlement Area. Emphasis...