7 dossier(s) trouvé(s) portant l’étiquette "northern pike" (les projets pluriannuels sont regroupés): Vous ne trouvez pas les résultats souhaités? Essayez la recherche avancée..
chercheur principal:Evans, Marlene S. Année(s) de permis:202320222017
2015
2014201320122011201020092008200720062005 Résumé:
This study is continuing to investigate whether contaminant levels are changing in fish in the Northwest Territories with a focus on Great Slave Lake which the research team have been studying since the early 1990s. The research team plan to collect lake trout from Great Slave Lake (Hay River area and Lutsel K’e area). The team also plan to collect burbot from the Lutsel K’e and Fort Resolution ar...
chercheur principal:Dahl-Fequet, Monica L Année(s) de permis:
2005
Résumé:
The objective of this project is to collect biological and hydrological information on Hill Creek. It is unknown as to whether or not the culvert at the Hill Creek highway crossing is large enough to allow for the spring migration of spawning fish. The researchers will collect fisheries and habitat information on Hill Creek. This data will include fish presence/absence, lifestage and species com...
chercheur principal:Dick, Terry A. Année(s) de permis:
2005
2004 Résumé:
The objective of this research is to study what lake trout, whitefish and pike eat and their movements in a small northern Shield lake (Chitty Lake).
Transportation of personnel and equipment into and out of Chitty Lake will be by single engine float plane (Air Tindi). During this study, the researchers will use standardized gill nets, a backpack electroshocker, a seine net, VEMCO acoustic tra...
chercheur principal:McGurk, Michael Année(s) de permis:
2005
2004 Résumé:
The researchers will measure water quality, aquatic ecology and the status of fish populations in ponds and lakes along the proposed discharge route of mine water from the Colomac Mine (North Pond, L-Shaped Lake, Paddle Lake, Lake 315, and Lower Lake) and compare those data with data collected from reference lakes (Steeves Lake, Baton Lake, and Spanner Lake). Work will include taking three samples...
chercheur principal:Moore, Peter Année(s) de permis:2001
2000
Résumé:
This program is a detailed assessment of the created/enhanced habitat at Frank Channel, based on fish use and function in comparison with habitat design targets. Habitat monitoring will require seasonal assessments within the open water period at times associated with the targeted fish's life stages (Northern Pike). During early spring, mid summer and late summer, Frank Channel habitat will be m...
chercheur principal:Schwalme, Karl Année(s) de permis:
1988
Résumé:
Karl Schwalme wants to know how and why the fat content of pike changes during the year. He will collect about 30-50 great northern pike from each lake by using a 2 1/2 inch gill net which will only be set during the day. He will then take the fish back to the Inuvik Research Centre to determine their fat content. Since some of the fats help to prevent heart disease in people, the annual change ...
chercheur principal:Mackay, William C. Année(s) de permis:
1979
Résumé:
Using radio telemetric techniques to determine the extent of movement and the types of habitat utilized by Northern Pike....