17 record(s) found with the tag "hydrology" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

MacTung Project Environmental Baseline Studies
Principal Investigator: Hoos, Rick
Licensed Year(s): 2007 2006
Summary: The purpose of the MacTung 2006 Environmental Baseline Studies is to collect additional information regarding meteorology, hydrology, aquatic resources, vegetation, terrain and wildlife in the MacTung Project area. This baseline environmental information is required to complete the environmental assessment and regulatory applications for approval of the proposed MacTung Mine project. Overland t...


WO Diamond Project
Principal Investigator: Hamm, Sharleen
Licensed Year(s): 2006
Summary: In view of Peregrine Diamonds Ltd.’s move to advance the DO-27 kimberlite pipe of the WO Diamond Project to the pre-feasibility assessment phase, this project is proposed to collect baseline data that would contribute to an Environmental Assessment in subsequent years. Gartner Lee Ltd has been contracted to undertake field sampling, which will consist of examining surface water quality; hydrology;...


Baseline Data Collection, Yellowknife Gold Project, Tyhee NWT Corp.
Principal Investigator: Weagle, Ken V
Licensed Year(s): 2005 2004
Summary: The purpose of this fieldwork is to continue the collection of baseline data to support an anticipated application to the Mackenzie Valley Land and Water Board. There are four main components in the 2005 program: 1) Air quality, climate and noise asses...


1998 Aquatic Effects Monitoring Program Habitat Compensation Monitoring Program Panda Diversion Channel
Principal Investigator: Thomas, Craig J
Licensed Year(s): 2003 2002 2001 2000 1999 1998
Summary: The project will look at the effectiveness of created fish habitat within the on-site Panda Diversion Channel. Assessments will include fish use, invertebrate use, stability and function on a seasonal and yearly basis. Assessments will include the collection of fish (all to be released live), macroinvertebrates, the identification of habitat features, substrate assessments, and hydrology and hydra...


Environmental Baseline Program Colomac Area (Indin Lake), N.W.T.
Principal Investigator: Kalich, Laura
Licensed Year(s): 1996
Summary: The work will include seven aspects of research. Water quality will be done through a number of sampling locations at different times of the year. A hydrology study will measure high water discharge and stage measurements at seven streams in the vicinity of the proposed all-weather road. Bathymetric surveys will conducted on lex lake and six smaller un-named lakes in the vicinity of the propos...


Evaporation Studies at Northern Mine Sites
Principal Investigator: Edwards, Thomas W.D.
Licensed Year(s): 1993
Summary: The proposed research is part of an ongoing program of hydrological studies in the north aimed at improving our understanding of how water cycles through natural drainage systems. This year, I will examine water evaporation on lakes and ponds that are located on mine sites: results from this research will aid in the design of better tailings impoundments containing mine wastes/contaminants....


Nicholas Lake Project/George Lake Project
Principal Investigator: Ott, Bruce
Licensed Year(s): 1990 1989
Summary: The Researcher and his team will be collecting baseline environmental data on natural conditions at Nicholas and George Lakes. This includes collecting water, soils and vegetation information....


TOTAL PAGES: 2