Principal Investigator:Panayi, Damian Licensed Year(s):201820172016
2015
20142013201220112010 Summary:
The objective of the Bluefish monitoring programs are is to monitor flow, water levels, sediment deposition, and monitor fish use of the compensation habitat in Bluefish Lake, and fish use of the Yellowknife River as per the Bluefish FAA Fisheries Act Authorization and Water License.
The monitoring programs at Bluefish are multiyear programs that are required under the Fisheries Act Authorizati...
Principal Investigator:Cote, Jason E Licensed Year(s):2010
2009
Summary:
The objectives of this project are to:
- Conduct a fish and fish habitat assessment upstream and downstream of the proposed Project Site (2nd rapids on Snowdrift River). This would involve vegetation assessment, depth and velocity transects and fish sampling.
- Conduct fish and fish habitat assessments in the Snowdrift River tributaries at the proposed road crossings between Lutsel K’e communi...
Principal Investigator:Goad, Robin E Licensed Year(s):20172016201420132012201120102009
2008
2006200520042003 Summary:
The objective of this study is to conduct environmental surveys in the area surrounding the NICO Project camp and along the proposed routes of an all-weather access road and a transmission line to the Snare River Hydroelectric station.
The scope of the studies will include fish and fish habitat, hydrology and water quality surveys. Site visits by field staff and assistants will be made during...
Principal Investigator:Uren, Shane Licensed Year(s):
2007
2006 Summary:
The objective of the proposed work is to collect information on the fish community and fish habitat present in Trudel Creek, and identify the possible positive and negative impacts of reducing flow into the creek if the Taltson Hydro Project is expanded.
The field survey of the fish habitat and community of Trudel Creek and a section of the Taltson River will take place in spring, with the poss...
Principal Investigator:Grabke, Dan Licensed Year(s):
2000
Summary:
In 1999, the Northwest Territories Power Corporation was awarded a 25 year water licence to operate its three hydroelectric plants on the Snare River. Conditions of this water licence included that two studies be done by the Corporation. The first study is an assessment addressing the removal of minimum flow requirements on two of the dams. This study will include a current assessment of fish a...