3 record(s) found with the tag "hydroelectric station" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Lutsel K'e Mini Hydro Project
Principal Investigator: Cote, Jason E
Licensed Year(s): 2010 2009
Summary: The objectives of this project are to: - Conduct a fish and fish habitat assessment upstream and downstream of the proposed Project Site (2nd rapids on Snowdrift River). This would involve vegetation assessment, depth and velocity transects and fish sampling. - Conduct fish and fish habitat assessments in the Snowdrift River tributaries at the proposed road crossings between Lutsel K’e communi...


Aquatic and Fisheries Assessments for a Minimum Flow Threshold for Trudel Creek
Principal Investigator: Uren, Shane
Licensed Year(s): 2007 2006
Summary: The objective of the proposed work is to collect information on the fish community and fish habitat present in Trudel Creek, and identify the possible positive and negative impacts of reducing flow into the creek if the Taltson Hydro Project is expanded. The field survey of the fish habitat and community of Trudel Creek and a section of the Taltson River will take place in spring, with the poss...


Snare River Aqautic Study
Principal Investigator: Grabke, Dan
Licensed Year(s): 2000
Summary: In 1999, the Northwest Territories Power Corporation was awarded a 25 year water licence to operate its three hydroelectric plants on the Snare River. Conditions of this water licence included that two studies be done by the Corporation. The first study is an assessment addressing the removal of minimum flow requirements on two of the dams. This study will include a current assessment of fish a...