71 record(s) found with the tag "environmental protection plan" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Diavik Diamond Mines Inc. 2001 Aquatic Effects Monitoring Program
Principal Investigator: Baker, Mike
Licensed Year(s): 2024 2023 2022 2021 2019 2018 2017 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2005 2004 2003 2002 2001
Summary: The research team will visit 11 fixed monitoring stations by boat. At each station, water samples will be collected at mid-depth for full chemical analyses (major ions, trace metals and nutrients) using the lowest commercially available analytical detection limits. At each station, samples will also be collected for zooplankton and phytoplankton biomass. Samples for taxonomy will be archived. ...


2001 Fish and Fish Habitat and Water Quality Surveys: Sahtu Settlement Area
Principal Investigator: Metikosh, Serge
Licensed Year(s): 2001
Summary: The research team proposes to collect information about fish habitat features and use on watercourse crossings located on Crown Land along the tentative pipeline corridor in the Sahtu Settlement Area. The amount of work to be completed at each watercourse crossing will be determined during the reconnaissance level survey and will largely be driven by their size and flow characteristics. Smaller ...


Vegetation, Forestry and Soils Surveys: Sahtu Settlement Area
Principal Investigator: Bush, Dana
Licensed Year(s): 2001
Summary: The BC Terrestrial Ecosystem Mapping inventory standard will be used to provide a uniform method of describing vegetation, soil and terrain based on air photo interpretation and field data collection. The sampling sites will be located on Crown Land contained within a 1 km corridor with 'bulges' in areas of special concern such as river crossings. Surveying sites accessed by helicopter, boat, veh...


Reconnaissance Surveys to Select Sample Sites for Detailed Biophysical Surveys in the Sahtu Settlement Area
Principal Investigator: Green, Jeff
Licensed Year(s): 2001
Summary: The proposed research program will be carried out on Crown Lands located within the Sahtu Settlement Area. The research team will conduct water and aquatic, terrestrial and social reconnaissance surveys on Crown Lands located within the proposed development area. Helicopters will be used, to allow aerial examination of specific sites and, if required, to land for ground inspections. Helicopters...


Reconnaissance Surveys to Select Sample Sites for Detailed Biophysical Surveys in the Gwich'in Settlement Area
Principal Investigator: Green, Jeff
Licensed Year(s): 2001
Summary: The research team will conduct water and aquatic, terrestrial and social reconnaissance surveys of the proposed development area. Helicopters will be used, to allow aerial examination of specific sites and, if required, to land for ground inspections. Helicopters will fly at elevations greater than 100 m above ground level (AGL), although at some sites, it may be necessary to fly at lower altit...


Vegetation, Forestry and Soils Surveys: Gwich'in Settlement Area
Principal Investigator: Bush, Dana
Licensed Year(s): 2001
Summary: The BC Terrestrial Ecosystem Mapping inventory standard will be used to provide a uniform method of describing vegetation, soil and terrain based on air photo interpretation and field data collection. The sites will be contained within a 1 km corridor with 'bulges' in areas of special concern such as river crossings. Surveying sites accessed by helicopter, boat, vehicle and/or on foot. To avoid c...


2001 Fish and Fish Habitat and Water Quality Surveys: Gwich'in Settlement Area
Principal Investigator: Metikosh, Serge
Licensed Year(s): 2001
Summary: The research team proposes to collect information about fish habitat features and use on 111 watercourse crossings along the tentative pipeline corridor in the Gwich'in Settlement Area. The amount of work to be completed at each watercourse crossing will be determined during the reconnaissance level survey and will largely be driven by their size and flow characteristics. Smaller watercourses (t...


Summer 2001 Hydrology Surveys within the Gwich'in Settlement Region: Biophysical Baseline Studies in support of the Mackenzie Delta Gas Feasibility Study
Principal Investigator: Sawetsky, Les
Licensed Year(s): 2001
Summary: A detailed data collection program will be undertaken on 20 streams. All major streams will be included in the survey. The proposed survey will begin in late July and continue until early September 2001, and will consist of comprehensive studies at selected streams, as discussed below, to define how the streams behave and how they change in time. The focus of the hydrology component is on descr...


Summer 2001 Fish and Fish Habitat Surveys: Biophysical Baseline Studies in support of the Mackenzie Delta Gas Feasibility Study
Principal Investigator: Metikosh, Serge
Licensed Year(s): 2001
Summary: The research team proposes to collect information about fish habitat features and use of selected delta lakes. The selection of the lakes to study will be determined during the reconnaissance level survey and will largely be driven by their proximity to the production field, the gathering system and pipeline corridor. Additional water quality information will be collected at ten of the selected ...


Summer 2001 Hydrology Surveys within theInuvialuit Settlement Region: Biophysical Baseline Studies in support of the Mackenzie Delta Gas Feasibility Study
Principal Investigator: Sawetsky, Les
Licensed Year(s): 2001
Summary: A detailed data collection program will be undertaken on 20 streams. All major streams will be included in the survey. The proposed survey will begin in late July and continue until early September 2001, and will consist of comprehensive studies at selected streams, as discussed below, to define how the streams behave and how they change in time. The focus of the hydrology component is on descr...