Principal Investigator:Liu, William X Licensed Year(s):2024
2023
2022202120202019201820172016201520142013201220112010 Summary:
This licence has been issued for the scientific research application No.5393.
The objective of the proposed studies is to implement the approved environmental monitoring and management plans to monitor any potential environmental effects from the mining activities at the Gahcho Kue Mine.
The proposed studies will include the collection of air quality, geochemistry, hydrology, water and sedi...
Principal Investigator:Chamberland, Joseph Licensed Year(s):
2016
2015 Summary:
The research project Water Ecosystems Monitoring using Earth Observation aims to define an Earth Observation (EO) driven monitoring program to provide information towards monitoring environmental indicators of northern ecosystem health. Once the project is done information on water indicators including water temperature, suspended sediment concentrations, water levels, and ice quality and will be ...
Principal Investigator:Panayi, Damian Licensed Year(s):201820172016
2015
20142013201220112010 Summary:
The objective of the Bluefish monitoring programs are is to monitor flow, water levels, sediment deposition, and monitor fish use of the compensation habitat in Bluefish Lake, and fish use of the Yellowknife River as per the Bluefish FAA Fisheries Act Authorization and Water License.
The monitoring programs at Bluefish are multiyear programs that are required under the Fisheries Act Authorizati...
Principal Investigator:Jones, Paul D Licensed Year(s):2022202120192017201620152014
2013
2013
Summary:
The SWEEP program is being used to establish a community based environmental monitoring program in the Slave River and delta. The project has been funded for 2 years by the Canadian Water Network (CWN) to develop a new 'node' for community based monitoring which is harmonized with those already established by other CWN projects. SWEEP will develop a suite of both 'community based' and 'western s...
Principal Investigator:Byrne, Geraldine Licensed Year(s):
2013
Summary:
The Aquatic Effects Monitoring Plan (AEMP) and Sediment and Erosion Management Plan (SEMP) are requirements under water license MV2011L0002 issued by the Mackenzie Valley Land and Water Board (MVLWB). The objective of the AEMP is to monitor and identify potential short-term, long-term and cumulative changes throughout the Taltson River aquatic environment. The objective of the SEMP is to identify...
Principal Investigator:Tonn, William Licensed Year(s):20142013
2012
201120102009 Summary:
The objectives of this project are: 1) to study the freshwater ecology, hydrology, and hydraulics of small lakes and streams in the Lac de Gras basin before habitat modification; 2) to monitor the changes in ecosystem productive capacity resulting from habitat modifications designed to increase habitat connectivity and fish passage; and 3) to assess the effectiveness of such habitat modifications ...
Principal Investigator:Draho, Bob Licensed Year(s):
2010
2009 Summary:
The objectives of this four day field survey is to inspect the 4 hydrology stations and 1 meteorology station to ensure they are in working order, repair if required, and download site-specific weather and stream flow data from the stations.
Equipment at each hydrostation consists of a datalogger (to record) and a pressure transducer (to detect fluid pressure and produce a signal related to the...
Principal Investigator:McCallum, Dee Licensed Year(s):20212020201920182017201620152014201220112010
2009
200820072006200520042002200120001999 Summary:
This license has been issued for the scientific research application #942.
The objective of the environmental monitoring programs is to fulfill the requirements outlined under the Snap Lake Mine’s Land Use Permit, Water Licence, Environmental Agreement and Fisheries Authorization and to meet De Beers’ corporate commitments on the environment.
The environmental monitoring program will cover a...
Principal Investigator:Hoos, Rick Licensed Year(s):
2007
Summary:
The objectives of the single site visit in 2007 are as follows: (1) to re-install instruments at the 4 existing hydrostations, so that data will be recorded automatically during the summer season; Tyhee personnel will remove the instruments (a datalogger and pressure transducer for each station location) at the end of the season, before freezeup; (2) download data from the existing weather station...
Principal Investigator:English, Michael C Licensed Year(s):20122010200920082007
2006
20052004 Summary:
The primary objectives of this research are: to improve our national snow water equivalent (SWE) monitoring capabilities by acquiring the necessary data to develop accurate satellite remotely sensed, passive microwave, estimates in the spatially expansive and persistently snow covered arctic tundra environment, and to understand and quantify the spatial and temporal contribution of snowmelt water...