Principal Investigator:Campbell, Joseph W Licensed Year(s):201820172016
2015
2014 Summary:
Follow-up on exploration activity associated with MVLWB land use permit MV2014C0005 on Terrax Minerals Inc. City of Yellowknife Gold Project. Work would include initial environmental baseline work, and expansion of research programs to establish sufficient study for possible future Environmental Impact Assessment of potential mine development if exploration activities are successful.
Work will ...
Principal Investigator:Haas, Claudia A Licensed Year(s):
2012
2011 Summary:
This project is to fill gaps in ecological information on a Candidate Protected Area while it makes its way through the NWT Protected Areas Strategy (PAS) process. This information will be used by the working group to make recommendations on final boundary and management planning for the area.
The study will be done at the same time as a study on mercury in fish being conducted by the Dehcho F...
Principal Investigator:Lennie-Misgeld, Peter Licensed Year(s):
2011
2010 Summary:
The main objective of the program is to collect fisheries and environmental baseline information to better understand the environmental characteristics of the Great Bear River and to support potential future development of hydropower on the Great Bear River. The program is not being conducted to support a specific project as there are no hydropower projects planned for the Great Bear River at thi...
Principal Investigator:Goad, Robin E Licensed Year(s):201720162014201320122011201020092008
2006
200520042003 Summary:
The scope of environmental studies to be undertaken includes fish and fish habitat, water quality, air quality, and vegetation surveys. Equipment for habitat surveys will be limited to standard field measuring and surveying equipment, such as GPS units, and helicopters. An automated meteorological station has been set up to collect weather data.
A summer and fall fish and fish habitat survey w...
Principal Investigator:Graf, Linda H Licensed Year(s):2007
2006
Summary:
The anticipated studies include lake bathymetry, fish and fish habitat, and vegetation studies. Measurements of lake depths, surface area and other bathymetric features will determine lakes suitable for water withdrawal during the proposed construction phase of the winter access roads. Bathymetry work will be conducted with a digital echo-sounder linked to a GPS and other supporting equipment. Lak...
Principal Investigator:McGurk, Michael Licensed Year(s):
2004
Summary:
Indian and Northern Affairs Canada has taken responsibility for the remediation and monitoring of Silver Bear Properties. Rescan Environmental Services Ltd has been hired to conduct baseline aquatic and terrestrial surveys of the area and to prepare a re...
Principal Investigator:Goad, Robin E Licensed Year(s):
2004
Summary:
Fortune Minerals is considering building an all-weather access road to their current expanded exploration program on the NICO property. This program will require environmental baseline surveys to augment existing information on species and habitat in the...
Principal Investigator:Graburn, Larry Licensed Year(s):
2004
2003 Summary:
The objective of this program is to carry out aerial reconnaissance and preliminary site investigations, topographical aerial mapping, and surface reconnaissance in the general vicinity of the proposed route for the Mackenzie Gas Project. Information fro...
Principal Investigator:Newyar, Chuck Licensed Year(s):
2003
Summary:
This survey is required to obtain specific environmental information to be used in support of land use permit and water licence applications for EnCana's proposed winter drilling program within the Tulita District of the Sahtu Settlement Area. Emphasis...