Principal Investigator:Povey, Andrew Licensed Year(s):
2003
Summary:
Noise monitoring will be conducted at select potential locations for facilities, infrastructure, access roads and granular resources in the Sahtu Settlement Area where there is the potential for noise affecting people and wildlife during the construction...
Principal Investigator:Graburn, Larry Licensed Year(s):
2004
Summary:
The geotechnical investigation program involves drilling or excavating to collect soil samples at specific sites and the installation of thermal recording devices. Boreholes or excavations will be drilled at approximatley 30-35 sites (22 borrow sites, 4...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
Summary:
Noise monitoring will be conducted at a potential facility location near Fort Good Hope and near the Blackwater River. These data will provide estimates of current background ambient noise in the project area, prior to construction of the Mackenzie Gas P...
Principal Investigator:Povey, Andrew Licensed Year(s):
2002
Summary:
The vegetation component of the 2002 baseline studies will focus on completion of the vegetation typing surveys. Initially, a reconnaissance flight will be required over Sahtu Private Lands along the study corridor. This flight will be used to identify...
Principal Investigator:Kershaw, G. Peter Licensed Year(s):
2002
200120001999199819971996199519941993 Summary:
The main study objectives are to 1) determine the status of permafrost landforms in the study area; and 2) determine the long-term recovery after abandonment of the CANOL No 1 project. With climate change potentially resulting in warming in the north, it...
Principal Investigator:Sawetsky, Les Licensed Year(s):
2001
Summary:
A detailed data collection program will be undertaken on all major streams in the proposed pipeline corridor. The proposed survey will begin in mid-September and continue until late December, 2001 and will consist of comprehensive studies at selected streams, as discussed below, to define how the streams behave and how they change in time. The focus of the hydrology component is on describing h...
Principal Investigator:Bush, Dana Licensed Year(s):
2001
Summary:
The BC Terrestrial Ecosystem Mapping inventory standard will be used to provide a uniform method of describing vegetation, soil and terrain based on air photo interpretation and field data collection. The sampling sites will be located on Crown Land contained within a 1 km corridor with 'bulges' in areas of special concern such as river crossings. Surveying sites accessed by helicopter, boat, veh...
Principal Investigator:Green, Jeff Licensed Year(s):
2001
Summary:
The proposed research program will be carried out on Crown Lands located within the Sahtu Settlement Area. The research team will conduct water and aquatic, terrestrial and social reconnaissance surveys on Crown Lands located within the proposed development area. Helicopters will be used, to allow aerial examination of specific sites and, if required, to land for ground inspections. Helicopters...
Principal Investigator:Collard, Tod Licensed Year(s):
2001
Summary:
The proposed field research program on lands located within the Sahtu Settlement Area will include the following general areas of study: (1) freshwater aquatics (freshwater fish and their habitats, water quality, hydrology); (2) terrestrial wildlife, including waterfowl; (3) vegetation and soils; (4) archaeology; and (5) noise. For all studies, access will be by helicopter, boat or on foot, as ap...
Principal Investigator:Melton, Derek Licensed Year(s):2002
2000
Summary:
Researchers will assess fish habitat (by documenting the potential of waterbodies) and to determine the presence or absense of wildlife in the vicinity of the proposed project. A search for registered archaelogical sites within the proposed area will also be undertaken. Information from these studies will form part of an environmental assessment for the proposed project. Researchers will access...