4 record(s) found in the location "North Slave Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

De Beers Snap Lake Mine Environmental Monitoring 2020-2024
Principal Investigator: Prather, Colleen
Licensed Year(s): 2021 2020 2019 2018 2017 2016 2015 2014 2012 2011 2010 2009 2008 2007 2006 2005 2004 2002 2001 2000 1999
Summary: This licence has been issued for the scientific research application No.4635. The objective of this research are to conduct environmental monitoring of wildlife, vegetation, air quality, hydrology, and aquatic effects in the Snap Lake study area. The research team will collect incidental observational data of wildlife near the Snap Lake Mine. Through this project the research team will coll...


Environmental Baseline Surveys of the Fortune Minerals Ltd. NICO Project
Principal Investigator: Harris, Katherine M.
Licensed Year(s): 2017 2016 2014 2013 2012 2011 2010 2009 2008 2006 2005 2004 2003
Summary: The objective of this research project is to collect baseline environmental information for future environmental effects monitoring. Surveys may include assessments of fish, fish habitat, benthic invertebrates, plankton, water and sediment quality, wetlands and geochemistry. Equipment for surveys will be limited to standard field measuring and surveying equipment, such as automated water qualit...


Aquatic Studies in support of the Discovery Mine Remediation Work
Principal Investigator: Ford, Bruce S
Licensed Year(s): 2005
Summary: This study involves fish sampling to determine relative abundance and levels of mercury and other metals in fish tissue in Giauque Lake, Thistlethwaite Lake and Control Lake A, as well as benthic invertebrate sampling and water quality sampling in the three lakes to complement the fish sampling. 3 sites in Giauque, 3 in Thistlethwaite and one in Control Lake A will be recorded. Captured fish will ...


2001 Fish Habitat Assessments for Future Mine Road Developments
Principal Investigator: Moore, Peter
Licensed Year(s): 2001
Summary: Fish will be collected and released live using seining and electro-fishing techniques. Data collection will also include flow monitoring. All assessments will be completed on watercourses within the Misery Road, Sable Lake Road and Fox Lake Road developments within the mine site. BHP will provide support staff which will include people hired locally....


TOTAL PAGES: 1