Principal Investigator:Baltzer, Jennifer L Licensed Year(s):2018
2017
2016 Summary:
The objective is to improve the empirical foundations for predictive caribou habitat mapping within the forested areas of the Taiga Plains and Taiga Shield Ecoregions in the Northwest Territories, roughly south of Great Bear Lake. The research team will establish a network of long-term study plots across a range of fire characteristics and vegetation types, where the team will measure the rate and...
Principal Investigator:Lewkowicz, Antoni G Licensed Year(s):2018
2017
2016 Summary:
The goal of this project is to look at how permafrost is changing following forest fire over a range of environmental conditions, with the purpose of improving how change is modeled in the future. The fires of 2014 in the southwestern Northwest Territories (NWT) provide an opportunity to examine how discontinuous permafrost responds to disturbances. This work is being carried out in collaboration ...
Principal Investigator:Langhorne, Amy Licensed Year(s):
2011
Summary:
The objective of the plant and soil sampling is to determine baseline metal and polycyclic aromatic hydrocarbon concentration in surficial soils and plants growing in the study area. The data will be used in the human health and terrestrial wildlife risk assessment.
The proposed study will include the collection of up to 30 co-located soil, plant, and insect samples at six terrestrial locations...
Principal Investigator:Stephen, Celsian C Licensed Year(s):
2010
Summary:
The objective of this project is to enhance our understanding of the controls on the mobility of metal contaminants in mine-impacted environments. More specifically, to enhance our understanding of the role terrestrial and aquatic plants play in sequestering mine-contaminants such as arsenic, antimony, copper, lead and zinc.
The field methods for this program consist of a soil and vegetation...
Principal Investigator:Reimer, Kenneth J. Licensed Year(s):
2010
Summary:
The objectives of this research are to:
1. Determine total arsenic and arsenic species in water from Kam Lake and Meg Lake,
2. Determine total arsenic and arsenic species in porewater (which is a link between sediments and overlying water) from Kam Lake and Meg Lake,
3. Determine plankton communities, and total arsenic and arsenic species in plankton fractions,
4. Determine arsenic in food sou...
Principal Investigator:MacNeill, Scott W Licensed Year(s):2017201620142013201220112010
2009
20082006200520042003 Summary:
The objective of this study is to supplement the existing environmental baseline data for the Fortune Minerals NICO Property to support the environmental assessment process for future mine development.
Environmental surveys will be conducted in the area surrounding the project base camp and along the proposed routes of an all-weather access road to Behchoko and a transmission line to Snare hyd...
Principal Investigator:Chen, Wenjun Licensed Year(s):
2005
2004 Summary:
The research team is working to become familiar with the impact of human disturbances on vegetation in northern Canada for their carbon studies. The objective of this study is to collect vegetation and biophysical data for use as verification of ground cover type and disturbance for use in satellite imagery classification and biomass and soil sampling for carbon modeling along the Ingraham Trail....
Principal Investigator:Weagle, Ken V Licensed Year(s):
2005
2004 Summary:
The purpose of this fieldwork is to continue the collection of baseline data to support an anticipated application to the Mackenzie Valley Land and Water Board. There are four main components in the 2005 program: 1) Air quality, climate and noise asses...
Principal Investigator:Turchenek, Larry Licensed Year(s):
2004
Summary:
The overall project objective is to collect information on the Gahcho KuÚ and 'control lake' areas for use in impact assessment and environmental protection planning for a proposed mine development. AMEC Earth and Environmental (AMEC) has been retained t...
Principal Investigator:English, Michael C Licensed Year(s):20032002
2001
2000 Summary:
The crew will fly from Yellowknife to the Tundra Ecosystem Research Station camp on Daring Lake from BHP (Ekati Mine) by helicopter. The research team itinerary consists of: (1) setting up the camp; (2) sampling all of the major streams flowing into Daring Lake for chemistry and instantaneous flow; (3) walking through several basins to decide on an intensive sampling site; and (4) installing dri...