Principal Investigator:Panayi, Damian Licensed Year(s):20182017201620152014
2013
201220112010 Summary:
The objective of this study is to describe the terrestrial and aquatic environment in the Yellowknife River between Prosperous Lake and Bluefish Lake as per the Fisheries Authorization and the Water Licence. This may include investigating vegetation, water quality, benthic invertebrate populations, and fish. The results will be used to determine the most suitable means of fish habitat compensation...
Principal Investigator:Morrison, Scott Licensed Year(s):
2007
200620052004 Summary:
Consistent with the DFO authorization, the major objectives of this study are to:
1) to provide annual documentation of shoal habitat use by Lake Trout in the vicinity of the mine site. FA Clause 8.1.3
2) to ground truth hydroacustic equipment by capturing fish to identify species, collect life history data, tag, and then release
As stated in the Authorization for Works or Undertakings Affec...
Principal Investigator:Van Humbeck, Joe Licensed Year(s):
2007
Summary:
The objective of the 2007 portion of the project is to monitor control sites and treatment sites, and collect information on the habitat utilization. Data collected will be used to evaluate the continued success and effectiveness of the habitat construction and enhancement.
Field crews will fly to Matthews Lake, landing either on the runway or the lake. The Treeline Lodge, where the research te...
Principal Investigator:Hamm, Sharleen Licensed Year(s):
2006
Summary:
In view of Peregrine Diamonds Ltd.’s move to advance the DO-27 kimberlite pipe of the WO Diamond Project to the pre-feasibility assessment phase, this project is proposed to collect baseline data that would contribute to an Environmental Assessment in subsequent years. Gartner Lee Ltd has been contracted to undertake field sampling, which will consist of examining surface water quality; hydrology;...
Principal Investigator:Moore, Peter Licensed Year(s):2004
2003
Summary:
Dillon Consulting Limited has been retained to complete habitat restoration activities at the historic Salmita Mine site at Matthews Lake. The 2003 phase of this project is to conduct baseline aquatic assessments at the Matthews Lake site to identify pr...
Principal Investigator:Hubert, Ben Licensed Year(s):
2002
Summary:
The purposes of these studies are to update the environmental baseline data set for the Izok Project in preparation for submitting a project proposal for developing the orebody at Izok Lake. This study focuses on a mineral deposit in Nunavut. The project...
Principal Investigator:Thomas, Craig J Licensed Year(s):
2000
Summary:
This is a preliminary fisheries study to confirm 1989 baseline studies and to assist in impact assessment for Abandonment and Restoration (A & R) Plan for site closure. The researchers will conduct habitat assessments along drainages of Steeves Lake and Indin River (i.e. fish habitat mapping, assessment of habitat potential, 'spot check' confirmation of fish communities, the collection of instant...
Principal Investigator:Pelletier, Clem Licensed Year(s):
1994
Summary:
In project area streams, fish presence/absence and/or densities will be obtained by electrofishing representative habitat. Benthic invertebrates ans periphyton (stream algae) will be sampled at stream sites to determine seasonal changes in composition, distribution and abundance. Lake fisheries population studies will involve fish trapping. Lake limnology, plankton and benthic invertebrates wil...
Principal Investigator:Sekerak, Aaron D. Licensed Year(s):
1990
Summary:
The Researcher and his assistant will obtain information on fish in the area so that potential impacts of mining in the region can be assessed....