Principal Investigator:Maric, Robert Licensed Year(s):
2001
Summary:
The research team will be based out of Yellowknife. Travel to the Ekati Mine site will be by helicopter; travel on site will be on foot. The research team will be in the field for approximately seven days. Characterization of the hydrologic balance of the system under investigation will be completed by the collection of several hundred water samples (each with an approximate volume of 30 ml) at d...
Principal Investigator:Ootes, Luke Licensed Year(s):
2001
Summary:
The research team will be based out of Yellowknife. Travel to the Crestaurum Mine site will be by road; travel on site will be by foot. Detailed geological mapping will be carried out by gathering fist-sized samples of rock with a hammer, or rock saw. Both mineralized (ore-bearing) and un-mineralized samples will be collected. Samples will then be returned to the laboratory for further, detail...
Principal Investigator:Kerr, Daniel E. Licensed Year(s):2001
2000
1999 Summary:
The primary objective is to provide geoscience data and new exploration techniques in the Yellowknife Greenstone Belt area that can be used in delineation of reserves and discovery of new mineral deposits. The main mode of transportation will be by helicopter (206L), float plane, truck (where road access is available), and possibly by boat. The helicopter and plane will be based out of Yellowkni...
Principal Investigator:Whitney, Candace Licensed Year(s):
2000
Summary:
The Coppermine River basin has significant mineral resources including diamonds as well as base and precious metals. In the early 1990s, the Slave Geological Province experienced a dramatic increase in mining activity when diamonds were discovered in the middle of the West Kitikmeot/Slave area at Lac de Gras. Northern ecological systems are particularly at risk to impacts of mining and other land...
Principal Investigator:English, Michael C Licensed Year(s):200320022001
2000
Summary:
Tthe objective of this study is to continue research examining the hydrological and energy budget of small arctic esker lake basin during the spring melt period. The intent of this research is to understand the relationship between the energy budget and changes in soil moisture, rates of evapotranspiration, and changes in water discharge from a small tundra basin underlain by permafrost. Transpo...
Principal Investigator:Steinecke, Karin Licensed Year(s):
1998
1997 Summary:
The project will focus on understanding, analyzing and evaluating the reactions of the northern boreal forest ecosystems in the Great Slave Lake region due to man made stress of mining, settlement and connecting activities. The project will try to develop some general conclusions, statements and model systems. The research team (2 persons) will come from Europe to Yellowknife by plane. The base wi...
Principal Investigator:Hornal, Robert Licensed Year(s):
1997
1996 Summary:
Continuation of study started in 1996. Data on current conditions will be collected through literature review of government reports, through telephone conversations with community leaders and administrators and, when possible, visits to the communities....
Principal Investigator:Kalich, Laura Licensed Year(s):
1996
Summary:
The work will include seven aspects of research. Water quality will be done through a number of sampling locations at different times of the year. A hydrology study will measure high water discharge and stage measurements at seven streams in the vicinity of the proposed all-weather road. Bathymetric surveys will conducted on lex lake and six smaller un-named lakes in the vicinity of the propos...
Principal Investigator:Morantz, David Licensed Year(s):
1996
Summary:
The techniques to be used for the assessment of the fisheries in the Lac de Gras area will include small-mesh (1.5 inch) gillnetting, trapnetting (mark-recapture program), minnow-trapping and electroshocking (backpack model for stream surveys). Most fish will be live-released. A select number of fish will be retained (killed), for aging verification (using otoliths), tissue metals concentration ...
Principal Investigator:Stubley, Michael Licensed Year(s):199619951994
1993
199219911990 Summary:
The research team will examine, document and take samples of the surface outcrops (rocks) in the study area. This information will be recorded on a map which will summarize the geological rock types and mineral resources of the area....