De Beers - Gahcho Kué 2014 Environmental Monitoring Program
Principal Investigator: Kramers, Patrick
Licensed Year(s): 2024 2023 2022 2021 2020 2019 2018 2017 2016 2015 2014 2013 2012 2011 2010
Summary: The objective of the proposed studies is to continue to describe the existing environment, and obtain information once Project activities commence to determine potential project effects. The proposed studies will include the collection of air quality, hydrology, geochemistry, vegetation, soil, water and sediment quality, and fish and aquatic resources data and wildlife occurrence. These study ...


De Beers Snap Lake Mine - 2011-2014 Environmental Monitoring Program
Principal Investigator: Hood, Alexandra E
Licensed Year(s): 2021 2020 2019 2018 2017 2016 2015 2014 2012 2011 2010 2009 2008 2007 2006 2005 2004 2002 2001 2000 1999
Summary: The objective of the environmental monitoring program is to fulfill the requirements outlined under the Snap Lake Mine's Land Use Permit, Water License, Environmental Agreement, and Fisheries Authorization, and to meet De Beers’ corporate commitments on the environment. The environmental monitoring program will cover an assessment of aquatics (benthic invertebrates, fish, water quality, plankto...


De Beers - Gahcho Kué Ecological Risk Assessment Program
Principal Investigator: Langhorne, Amy
Licensed Year(s): 2011
Summary: The objective of the plant and soil sampling is to determine baseline metal and polycyclic aromatic hydrocarbon concentration in surficial soils and plants growing in the study area. The data will be used in the human health and terrestrial wildlife risk assessment. The proposed study will include the collection of up to 30 co-located soil, plant, and insect samples at six terrestrial locations...


2011 Baseline Studies for Avalon Rare Metals Inc. Proposed Thor Lake Rare Earth Element Project - Surface Water Hydrology and Climate
Principal Investigator: Lawson, Nick
Licensed Year(s): 2011 2010 2009
Summary: The goal of the 2011 Surface Water Hydrology & Climate program at Thor Lake is to collect additional data that describes the existing surface water and climate conditions at the Thor Lake Property. This information is required for continued baseline monitoring, environmental assessments and water management plans for the area. Data obtained will help determine a quantitative description of the ann...


Environmental Site Assessments at Five Abandoned Mines
Principal Investigator: Ziervogel, Herb
Licensed Year(s): 2010
Summary: The objectives of this project are to conduct environmental site assessments at the five sites to identify the extent of various contaminations in the soil, water and sediments. A remediation action plan will be prepared for future cleanup at the sites. The field team will use shovel and hand auger to collect limited soil and waste rock samples for lab testing. The lab testing will focus on ...


2008-2010 Baseline Studies for Avalon Ventures Ltd. Proposed Thor Lake Rare Earth Metals Project - Aquatics Component
Principal Investigator: Lawson, Nick
Licensed Year(s): 2012 2011 2010 2009 2008
Summary: The objectives of this project are to characterize the baseline water and sediment quality within the Thor Lake area, and to characterize the baseline aquatic community through the collection of phytoplankton, zooplankton and benthic invertebrates. Water, sediment and aquatic organisms will be collected from 20 stations within the Thor Lake area. Most stations will be accessed by ATV and/or bo...


Environmental Surveys of Fortune Minerals NICO Project
Principal Investigator: MacNeill, Scott W
Licensed Year(s): 2017 2016 2014 2013 2012 2011 2010 2009 2008 2006 2005 2004 2003
Summary: The objective of this study is to supplement the existing environmental baseline data for the Fortune Minerals NICO Property to support the environmental assessment process for future mine development. Environmental surveys will be conducted in the area surrounding the project base camp and along the proposed routes of an all-weather access road to Behchoko and a transmission line to Snare hyd...


2008-2010 Baseline Studies for Avalon Ventures Ltd. Proposed Thor Lake Rare Earth Metals Project - Soils, Terrain and Permafrost Component
Principal Investigator: Lennie-Misgeld, Peter
Licensed Year(s): 2009 2008
Summary: Soil samples will be taken from representative sites in order to complete soil reclamation suitability assessment. Surficial sediments and soils will be described at each pit. In addition, notes will be taken on vegetation, drainage and terrain features, etc. A permafrost survey will consist of drilling shallow holes (<3 m) to determine permafrost conditions. Shallow permafrost drilling will be...


2009 Baseline Studies for Avalon Ventures Ltd. Proposed Thor Lake Rare Earth Metals Project – Groundwater Hydrology and Hydrogeology
Principal Investigator: Lennie-Misgeld, Peter
Licensed Year(s): 2009
Summary: The baseline study is being conducted to aid Avalon Ventures in assessing potential environmental effects of its activities and having adequate environmental information to support filing of regulatory applications in the future. Two years of data collection is important for obtaining baseline ground water hydrology and quality data where seasonal changes in groundwater levels, recharge and discha...


Biophysical Baseline Studies in Support of the Izok Project
Principal Investigator: Fratton, Glenda
Licensed Year(s): 2012 2008
Summary: This research licence was issued for application # 785. The objectives of the research studies are the following: refine understanding of baseline conditions; provide input to design mitigation; evaluate potential changes in the environment in relation to the Izok Project; and contribute to the ongoing data collection of the Arctic environment. Gartner Lee Limited will collect and review exi...