De Beers Canada Snap Lake Mine Environmental Monitoring 2022
Principal Investigator: Tran, Lisa
Licensed Year(s): 2022
Summary: This licence has been issued for the scientific research application No.5143. The goal of this project is to collect environmental monitoring of wildlife (incidental observations only), vegetation, air quality, hydrology and aquatics in the Snap Lake study area. Methods used are outlined in the management and monitoring plans (aquatic effects monitoring program, water management plan, wildli...


Nechalacho Project
Principal Investigator: Drygeese, Cody RJ
Licensed Year(s): 2021
Summary: This licence has been issued for the scientific research application No.4994. The goal of this project is to document existing environmental conditions surrounding the Project area. Studies may include the following. Hydrology studies include the measurement of selected lake inflow and outflow and stream profile through field surveys, and installation of data loggers to continually monitor l...


De Beers Canada Snap Lake Mine Environmental Monitoring 2021
Principal Investigator: McLean, Sarah C
Licensed Year(s): 2021
Summary: This licence has been issued for the scientific research application No.4858. The objective of the project is to conduct environmental monitoring of wildlife (incidental observations only), vegetation, air quality, hydrology, and aquatics in the Snap Lake study area. Methods used are outlined in the management and monitoring plans (aquatic effects monitoring program, water management plan [s...


Ekati Engineering and Environmental Monitoring Programs
Principal Investigator: Pacholski, Laura J
Licensed Year(s): 2020
Summary: This licence has been issued for the scientific research application No.4671. The main objectives of the field work for 2020 will be: 1) to determine if the Ekati Diamond Mine is having an effect on the surrounding aquatic environment, wildlife, and air quality; and 2) to provide baseline data for areas where mine development may occur in the future. In winter, water samples will be collect...


City of Yellowknife Gold Project
Principal Investigator: Campbell, Joseph W
Licensed Year(s): 2018 2017 2016 2015 2014
Summary: Follow-up on exploration activity associated with MVLWB land use permit MV2014C0005 on Terrax Minerals Inc. City of Yellowknife Gold Project. Work would include initial environmental baseline work, and expansion of research programs to establish sufficient study for possible future Environmental Impact Assessment of potential mine development if exploration activities are successful. Work will ...


Arsenic speciation in Yellowknife Lakes during spring bloom
Principal Investigator: Reimer, Kenneth J.
Licensed Year(s): 2010
Summary: The objectives of this research are to: 1. Determine total arsenic and arsenic species in water from Kam Lake and Meg Lake, 2. Determine total arsenic and arsenic species in porewater (which is a link between sediments and overlying water) from Kam Lake and Meg Lake, 3. Determine plankton communities, and total arsenic and arsenic species in plankton fractions, 4. Determine arsenic in food sou...


Gahcho Kue' Biophysical Baseline Studies
Principal Investigator: Bekhuys, Tim
Licensed Year(s): 2006 2005
Summary: De Beers Canada has conducted a number of baseline studies in the Gahcho Kue' area, and is continuing these studies in 2005. AMEC Earth and Environmental will be doing the baseline studies on behalf of De Beers. The studies will consist of wildlife, fi...


Baseline Data Collection, Yellowknife Gold Project, Tyhee NWT Corp.
Principal Investigator: Weagle, Ken V
Licensed Year(s): 2005 2004
Summary: The purpose of this fieldwork is to continue the collection of baseline data to support an anticipated application to the Mackenzie Valley Land and Water Board. There are four main components in the 2005 program: 1) Air quality, climate and noise asses...


Taltson Hydro Project; Expansion Baseline Studies and Water Effects Monitoring Program
Principal Investigator: Uren, Shane
Licensed Year(s): 2004
Summary: The Expansion Project proposes to supply power to the Snap Lake, Gahcho Kue, Diavik and EKATI mine sites by expanding the existing infrastructure at the facilities on the Taltson River at Twin Gorges and at Nonacho Lake. Studies characterizing baseline e...


Tundra Hydrology and Chemistry, Daring Lake, NWT
Principal Investigator: English, Mike
Licensed Year(s): 2003 2002 2001 2000
Summary: The objectives of the research are to examine how increasing active layer depth, surficial geology, vegetation, slope and aspect impact changes in shallow groundwater and surface stream chemistry in two subbasins of the Daring Lake basin in the headwater...