108 Dossier(s) trouvé(s) à l’emplacement "Région désignée des Inuvialuits" (les projets pluriannuels sont regroupés): Vous ne trouvez pas les résultats souhaités? Essayez la recherche avancée..
chercheur principal:Millman, Peter M Année(s) de permis:
2006
Résumé:
The aim of the project is to obtain geological information by observing surface features of the Kamik Trend geological formation and to apply this to the reservoir model for the Tuk M18 gas discovery.
Transportation to the area will be by helicopter on a daily basis from Aklavik. Information will be gathered by visual observation, photography, manual measurements with handtools (inclinomete...
chercheur principal:Hammer, Lorne Année(s) de permis:
2006
Résumé:
Shell Exploration and Production Company (Shell) is proposing to mobilize the Mobile Offshore Drilling Unit (MODU), Kulluk, from McKinley Bay, Northwest Territories to offshore Alaska, to initiate preparations for an offshore exploration drilling program to be carried out over the next several years. The Kulluk has been inactive and moored in McKinley Bay since 1993. Prior to that, the Kulluk had ...
chercheur principal:Biggar, Kevin Année(s) de permis:
2006
2005 Résumé:
Since the 1970s, the oil and gas industry has drilled at least nineteen exploratory wells in the Kendall Island Bird Sanctuary. Observations at associated drilling mud-sumps have been made; however, there remains a paucity of field data describing site conditions. It is also appreciated that construction of the proposed Mackenzie Valley pipeline will stimulate the development of Niglintgak and Tag...
chercheur principal:Kokelj, Steven V Année(s) de permis:
2006
2005 Résumé:
The research team will collect data to assess environmental conditions at well sites and sumps abandoned during the 1970s and 1980s, and in nearby undisturbed terrain in the Kendall Island Bird Sanctuary (KIBS). Study site locations include: Taglu D-43, Taglu H-54, Taglu C-42, Niglintgak B-19, Kumak K-16, Kumak E-58 and Kumak J-06. Permafrost investigations will take place in the surrounding terr...
chercheur principal:Kokelj, Steven V Année(s) de permis:2012201120102009200820072006
2005
Résumé:
There are three main parts in the researchers' project: 1) investigating the relationships between air and ground temperatures across treeline; 2) investigating the effects of permafrost degradation on the water quality of tundra lakes; and 3) examining...
chercheur principal:Seligman, Ben Année(s) de permis:
2005
2004 Résumé:
Shell Canada Limited will be surveying the river bottom to see if it is practical to use a barge-mounted gas conditioning facility at the Niglintgak Gas Field in the Mackenzie Delta. The researchers will do a bathymetric survey to identify locations that are not wide enough and/or deep enough for barge passage. Bathymetry is the science of measuring water depths and showing the variations in dep...
chercheur principal:Povey, Andrew Année(s) de permis:
2005
Résumé:
This project is a continuation of work that began in 2004. The Niglintgak Gas Processing facility may be constructed on a seaworthy barge, transported to a staging site in the Beaufort Sea, and then towed through the Mackenzie Delta channels to a sheltered location in Little Kumak Channel where the barge set-down site is proposed. This study will look at the environmental conditions along the pro...
chercheur principal:Pisaric, Michael FJ Année(s) de permis:200820072006
2005
Résumé:
There are three main parts in the researchers' project: 1) investigating changes in vegetation cover in the Inuvik region during the past 10,000 years using fossil pollen and stomata preserved in lake sediment; 2) investigating the importance of disturb...
chercheur principal:Widdifield, Dave Année(s) de permis:
2005
Résumé:
The researchers want to learn about the ground conditions at the site by drilling up to 69 boreholes to depths ranging from 16 to 50 metres. They want to find out how thick the active layer is and find any transitions between frozen and unfrozen ground;...
chercheur principal:Graburn, Larry Année(s) de permis:
2005
Résumé:
The general objective of the program is to obtain information with respect to subsurface conditions at the site by drilling up to fifty boreholes to depths ranging from sixteen to twenty metres. The specific objectives of the program are to characterize...