7 record(s) found in the location "Gwich'in Settlement Area" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2006 - 2007 Biophysical and Reconnaissance Studies in the Gwich’in Settlement Area
Principal Investigator: Hawkins, Jim R.
Licensed Year(s): 2007
Summary: Several biophysical and engineering studies on the feasibility of a pipeline in the Mackenzie Valley have been conducted, and will continue in 2007. Local knowledge, scientific research, and existing technical information are being used to develop a knowledge base for environmental protection plans, engineering design and regulatory processes. Route and site reconnaissance will be by helicopte...


Travaillant Lake Fish Population Assessment 2006
Principal Investigator: Millar, Nathan P
Licensed Year(s): 2007 2006
Summary: The Travaillant Lake system is one of the most culturally and traditionally important areas within the Gwich'in Settlement Area (GSA). In recent years, in light of proposed industrial development and exploration that may threaten the aquatic environment within this system, Travaillant Lake has become a focus of fisheries-related studies that have attempted to collect information on biological char...


2005 Terrestrial Studies in the Gwich’in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The 2005 terrestrial studies include vegetation mapping, rare plant surveys, rare plant mitigation planning, timber cruising, and landform, soil and permafrost investigations. All of the studies will be conducted by three- or four-person crews supported by helicopter. A local assistant will be included as part of each terrestrial survey team to assist in observing and recording data taken at surve...


Snow accumulation/runoff in high latitude permafrost basins
Principal Investigator: Marsh, Philip
Licensed Year(s): 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992 1990
Summary: The primary objective of this project is to improve understanding of the changes in water and energy in northern regions, and to develop improved computer models of these processes. The Trail Valley Creek, Hans Creek, and Zed Creek sites will be accessed...


2003 Summer Baseline Noise Monitoring Study in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2003 2002
Summary: Noise monitoring will be conducted at the proposed location of potential facilities near Inuvik as well as at select potential locations for infrastructure, access roads and granular resources in the Gwich'in Settlement Area where there is the potential...


2003 Winter Baseline Noise Monitoring Program in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2003
Summary: Noise monitoring will be conducted at two potential sites for a compressor station near Travaillant Lake. These data will provide estimates of background ambient noise, which is needed before construction of the Mackenzie Gas Project. The proposed monit...


Environmental Assessment for Proposed Oil and Gas Development Activities in the Gwich'in Region, NWT.
Principal Investigator: Melton, Derek
Licensed Year(s): 2002 2000
Summary: Researchers will assess fish habitat (by documenting the potential of waterbodies) and to determine the presence or absense of wildlife in the vicinity of the proposed project. A search for registered archaelogical sites within the proposed area will also be undertaken. Information from these studies will form part of an environmental assessment for the proposed project. Researchers will access...


TOTAL PAGES: 1