Principal Investigator:Thomas, Craig J Licensed Year(s):
2008
2005 Summary:
Objectives of this research will be to confirm the presence or absence of fish habitat at stream crossings associated with the Prairie Creek Winter Access Road alignment and if present document fish habitat characteristics (physical). The information will support documentation requirements for the Department of Fisheries and Oceans relating to the Fisheries Act and the potential need for a Fisheri...
Principal Investigator:Povey, Andrew Licensed Year(s):
2004
20032002 Summary:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This project is for aqu...
Principal Investigator:Povey, Andrew Licensed Year(s):2005
2004
Summary:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Ltd., and ExxonMobil Canada Properties conducted a number of baseline studies during 2001, 2002, and 2003 as part of the Mackenzie Gas Project. These...
Principal Investigator:Graburn, Larry Licensed Year(s):2005
2004
Summary:
This research forms part of an aerial reconnaissance program to observe the characteristic break-up patterns at selected watercourse crossings along the proposed pipeline right-of-way from the Deh Cho region in the south to the Inuvialuit Settlement Regi...
Principal Investigator:Graburn, Larry Licensed Year(s):2004
2003
Summary:
The objective of this field reconnaissance program is to conduct preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, watercourse crossings, water sources for ice road construction and potential cam...
Principal Investigator:Katopodis, C. Licensed Year(s):
1976
Summary:
To establish, under field conditions, the performance of baffles in culverts, and to make recommendations as to their use on highway river crossing design for fish passage....
Principal Investigator:McKinnon, Greg Licensed Year(s):
1976
Summary:
To assess the short and long term effects of highway construction on the aquatic resources of three streams....
Principal Investigator:Jasper, J.N. Licensed Year(s):
1976
Summary:
To measure peak flows to determine designs for proposed culvert and bridge sites along the Mackenzie Highway and to assess Environmental conditions (erosion, etc.) at stream crossings before and after construction and to determine their effects on fish migration....
Principal Investigator:Whitney, Paul Licensed Year(s):
1975
Summary:
Survey all streams to be crossed by the proposed Foothills Pipeline, conduct aerial and ground surveys of rare and endangered species, and inspect all stockpile and comprssor stations and wharfing sites associated with the proposed pipeline for Foothills Pipeline....
Principal Investigator:Davison, D.M. Licensed Year(s):
1975
Summary:
(1) To gather field data in order to assess drainage and erosion control and to evaluate the stability of slopes along the proposed Foothills Pipeline and at key river crossings; (2) To gather subsurface soil and ice information to analyze typical slope conditions for pipe support designs for Foothills Pipeline Limited....