4 record(s) found in the location "Dehcho Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Phase III ESA - Fort Simpson RCMP Detachment
Principal Investigator: Schulz, Eva
Licensed Year(s): 2013
Summary: The main objective of the Phase III Environmental Site Assessment is to delineate the hydrocarbon contamination at the site resulting from an overflow of fuel at a vent pipe of an above ground storage tank. Test holes will be excavated with a backhoe around the former spill area in order to collect soil samples. Each sample will be submitted to a Canadian Association for Laboratory Accreditatio...


Pointed Mountain, NWT, BP Canada Energy Company
Principal Investigator: Johnson, Pascale
Licensed Year(s): 2006 2005 2004 2003 2002
Summary: The Pointed Mountain Gas Plant, six associated wellsites, and the airstrip are being assessed during the decommissioning process. The site was initially constructed in 1966. The plant has been shut down since September 2001. The Pointed Mountain field has had soil, groundwater, and surface water assessed since 1990. Previous environmental work and public consultation at this site have identifi...


Modified Phase II-III Environmental Site Assessment F-36 Wellsite
Principal Investigator: Miller, Samantha
Licensed Year(s): 2003 2002
Summary: The objectives of this assessment are to conduct a soil investigation and remediation associated with the flare stack at the Paramount Resources Ltd. F-36 Wellsite. In August 2002, a modified Phase II Environmental Site Assessment was conducted. The bas...


2003 Terrestrial Studies in the Deh Cho Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004 2003 2002
Summary: These terrestrial studies will include vegetation and soils investigations. The primary goals are to classify vegetation, landforms, soils and permafrost in the project area, to identify locations of rare plants and uncommon plant communities, and to co...


TOTAL PAGES: 1