Modified Phase II Environmental Site Assessment O-35 Wellsite
Principal Investigator: Miller, Samantha
Licensed Year(s): 2003
Summary: The objectives of this assessment are to conduct a site investigation to evaluate potential environmental impact associated with daily facility operations associated with the O-35 wellsite. In August 2002, an Environmental Site Assessment was conducted....


Modified Phase II Environmental Site Assessment N-01 Wellsite
Principal Investigator: Miller, Samantha
Licensed Year(s): 2003
Summary: The objectives of this assessment are to conduct a site investigation to evaluate potential environmental impact associated with daily facility operations associated with the N-01 wellsite and to set up background concentrations of parameters for the lea...


Modified Phase II-III Environmental Site Assessment F-36 Wellsite
Principal Investigator: Miller, Samantha
Licensed Year(s): 2003 2002
Summary: The objectives of this assessment are to conduct a soil investigation and remediation associated with the flare stack at the Paramount Resources Ltd. F-36 Wellsite. In August 2002, a modified Phase II Environmental Site Assessment was conducted. The bas...


Environmental Studies for Anadarko Canada Energy Ltd.'s Proposed East Liard Gas Gathering System
Principal Investigator: Buckland, Laurie L
Licensed Year(s): 2003
Summary: The field studies are required to obtain specific environmental information for the study area and will be used in the preparation of baseline and environmental impact assessment reports in support of regulatory approvals. The study area is a 5 km wide...


Post Construction Water Quality Monitoring and Revegetation and Soil Monitoring for the Liard Pipeline and Gathering Project, Fort Liard, NT and Maxhamish Area, BC
Principal Investigator: Ferguson, Gordon
Licensed Year(s): 2003 2002
Summary: This monitoring program is designed to monitor water quality in the Liard pipeline study area and to assess reclamation success and identify areas of concern regarding revegetation and soil loss by erosion. A total of 8 permanent sampling transects were...


Vegetation Monitoring on the Chevron Pipeline Right-of-way, Fort Liard, NT 2002-2003
Principal Investigator: Mears, Margaret
Licensed Year(s): 2002
Summary: Nahendeh, with assistance from Alpine Environmental Consulting Ltd. and Golder Associates Ltd. was contracted on behalf of ChevronTexaco Corporation to conduct vegetation monitoring studies for the pipeline right-of-way from Chevron K-29 wellsite to the...


Preconstruction biophysical site assessment (wildlife, vegetation) of potential well locations and flow line options within the Significant Discovery Area, and post-construction vegetation and permafrost monitoring on the Cameron Hills Gathering System
Principal Investigator: Hong, Tom
Licensed Year(s): 2002
Summary: A pre-construction biophysical site assessment will focus on wildlife and vegetation. The proposed well-sites will be examined on foot, and the flowlines walked to document vegetation types, including rare species if present. Main vegetation types will b...


Environmental Assessment for the Fort Liard Area Seismic, Drilling and Development Project, Fort Liard, NT.
Principal Investigator: Antoine, Don
Licensed Year(s): 2001
Summary: Nahendeh Land and Environmental Services proposes to conduct baseline studies on behalf of Anadarko Canada Corporation, to determine the presence or absence of fish and wildlife habitat in the vicinity of the proposed project. The wildlife program will consist of a literature review, which would document any information on wildlife populations in the general project area, and identify any data ga...


Environmental Assessment for Petroleum Exploration, Drilling and Development, Cameron Hills, NWT.
Principal Investigator: Mears, Margaret
Licensed Year(s): 2000
Summary: Western was contracted on behalf of Paramount Resources to conduct preliminary baseline studies at Paramount's land holdings, and a proposed access corridor in the Cameron Hills area. The objective of this study is to determine the presence or absence of fish habitat and wildlife in the vicinity of the proposed project. A preliminary survey of the physical, chemical and biological features of the...


Environmental Assessment for Proposed Oil and Gas Development Activities
Principal Investigator: Melton, Derek
Licensed Year(s): 1999
Summary: The overall goal of this project is to conduct preliminary baseline studies at Paramount Resources proposed gas well sites in the Fort Liard area. The wildlife program will begin with of a literature review to identify previously identified wildlife populations in the area. Fisheries and water quality studies will involve a survey of fish habitat, and of the water quality of any water bodies in th...