20 dossier(s) trouvé(s) portant l’étiquette "mitigation" (les projets pluriannuels sont regroupés):
Vous ne trouvez pas les résultats souhaités? Essayez la recherche avancée..

Tarsiut Caissons - Removal and Remediation Plan
chercheur principal: Marshall, John J
Année(s) de permis: 2013
Résumé: The objective of this project at Thetis Bay is to ensure there is no unforeseen debris in the water around the caissons prior to moving. The objective at Tuktoyaktuk is to see if the caissons could be moved close enough to shore to offer a benefit to mitigate shore erosion. One small bathymetry vessel would be used in the program and one large Northern Transportation Company (NTCL) mainline tu...


Environmental Assessment for ConocoPhillips EL470
chercheur principal: Marken, Sandra L
Année(s) de permis: 2017 2016 2015 2014 2013 2012
Résumé: The objectives of this research project are: 1. To perform Initial scoping-level site assessment of Study Area to help inform the more detailed environmental assessment. The research team will use helicopter access to fly over the Study Area and assess overall environmental setting, identify likely sensitive areas, and focus on potential locations for drilling, access, staging and camps. Equipme...


De Beers Snap Lake Diamond Project 2004 Site Additional Baseline Data Collection
chercheur principal: Schryer, Rick P.
Année(s) de permis: 2021 2020 2019 2018 2017 2016 2015 2014 2012 2011 2010 2009 2008 2007 2006 2005 2004 2002 2001 2000 1999
Résumé: The objective of the program is to continue collecting environmental measurements pertaining to aquatic and terrestrial resources. This will be the sixth year of monitoring and baseline data collection. Monitoring will continue throughout the lifetime of...


Acoustic and Biological Test Study for the WesternGeco 2D Mackenzie River and Delta Seismic Programs
chercheur principal: Rosindell, Keith
Année(s) de permis: 2002
Résumé: A test program has been designed in response to National Energy Board, Department of Fisheries and Oceans, and Resources, Wildlife and Economic Development requests to collect information on seismic airgun acoustics within the Mackenzie River and on asso...


Devon Canada Corporation - Physical Oceanography, Geotechnical Parameters, Ice Environment, Coastal Process and Marine Water Quality for the Proposed Beaufort Sea Offshore Drilling Program.
chercheur principal: Evans, Kevin
Année(s) de permis: 2002
Résumé: The physical oceanography of the Beaufort Sea work will involve the identification and review of existing physical oceanographic data, a summary of this information and the application of this information within the context of the assessment and protecti...


Devon Canada Corporation - Fish, Plankton & Benthic Communities Study for the Proposed Beaufort Sea Offshore Drilling Program within the Inuvialuit Settlement Region
chercheur principal: Evans, Kevin
Année(s) de permis: 2002
Résumé: Research program on the fish, plankton and benthic communities. Potential effects of the drilling program on benthos include effects of chemical contaminants from drilling fluid wastes on the benthic community and hence the food web, and loss/change in b...


Devon Canada Corporation - Air Quality and Noise Studies Program for the proposed Beaufort Sea Offshore Drilling Program
chercheur principal: Evans, Kevin
Année(s) de permis: 2002
Résumé: The issues to be addressed in the emissions and air impact assessment portion of the project include: 1) adequacy of baseline emissions, air quality, meteorological and climatological data, as well as air quality and deposition monitoring data, for the B...


Alaskan Gas Producers Pipeline Team Environmental Studies for the Portion of the Proposed Mackenzie Valley Pipeline Route Located Within the Sahtu Settlement Area.
chercheur principal: Collard, Tod
Année(s) de permis: 2001
Résumé: The proposed field research program on lands located within the Sahtu Settlement Area will include the following general areas of study: (1) freshwater aquatics (freshwater fish and their habitats, water quality, hydrology); (2) terrestrial wildlife, including waterfowl; (3) vegetation and soils; (4) archaeology; and (5) noise. For all studies, access will be by helicopter, boat or on foot, as ap...


Aquatic Assessment
chercheur principal: Monita, Darwin
Année(s) de permis: 2001
Résumé: The aquatic assessment is scheduled for September and October, 2001, and will focus on three lakes in the Chevron Canada Resources 2001/2002 seismic program areas in the Ellice 3-D, Mallik 3-D and Ogruknang 3-D blocks. All lakes examined will exceed 400m in width. No field camps will be used, all garbage will be packed out, and all human waste buried. The field crew will include a senior fisheri...


Alaskan Gas Producers Pipeline Team Environmental Studies for the Portion of the Proposed Mackenzie Valley Pipeline Route Within the Gwich'in Settlement Area.
chercheur principal: Collard, Tod
Année(s) de permis: 2001
Résumé: The proposed field research program within the Gwich'in Settlement Area will include the following general areas of study: (1) freshwater aquatics (freshwater fish and their habitats, water quality, hydrology); (2) terrestrial wildlife, including waterfowl; (3) vegetation and soils; (4) archaeology; and (5) noise. For all studies, access will be by helicopter, boat or on foot, as appropriate. Mo...


TOTAL PAGES: 2