Environmental Assessment for ConocoPhillips EL470
Principal Investigator: Marken, Sandra L
Licensed Year(s): 2017 2016 2015 2014 2013 2012
Summary: The objectives of this research project are: 1. To perform Initial scoping-level site assessment of Study Area to help inform the more detailed environmental assessment. The research team will use helicopter access to fly over the Study Area and assess overall environmental setting, identify likely sensitive areas, and focus on potential locations for drilling, access, staging and camps. Equipme...


Devon Canada Corporation - Air Quality and Noise Studies Program for the proposed Beaufort Sea Offshore Drilling Program
Principal Investigator: Evans, Kevin
Licensed Year(s): 2002
Summary: The issues to be addressed in the emissions and air impact assessment portion of the project include: 1) adequacy of baseline emissions, air quality, meteorological and climatological data, as well as air quality and deposition monitoring data, for the B...


Biophysical Study-Inuvialuit Settlement Region
Principal Investigator: Komers, Petr
Licensed Year(s): 2001
Summary: Eleven plant species of national significance are found in the Mackenzie Delta. Following a preliminary classification using satellite images, the presence or absence of these species within sample areas will be determined during field surveys. After field data are collected, a more refined landscape classification model will be produced. To refine and test this model, 30 sites per vegetation com...


Fisheries & Vegetation analysis for the Range Oil Fort Liard P66 Pipeline Project
Principal Investigator: Machtans, Hillary
Licensed Year(s): 1998
Summary: Fisheries and vegetation field work will begin in June 1998. Three small streams north of Fort Liard will be surveyed to determine if fish are present or absent and to assess the fish habitat in each creek. Two of these creeks are tributaries to the Liard River and are located near the P66 well site. Fisherman Creek, the tributary draining into Fisherman Lake from the Liard Range will also be surv...


An Examination of Mitigation and Compensation inthe Environmental Process: Workshop Proceedings and Eight Case Studies
Principal Investigator: Scriven, David
Licensed Year(s): 1987
Summary: To complet an issue analysis of the Norman Wells Pipeline in order to clarify and further define the 7 major issues identified at the July 16/17, 1986 "Mitigation and compensation" Workshop held at the University of Ottawa. This is preliminary work to recommend a research prospectus for examination of mitigation and compensation in the Environmental Assessment process....