Principal Investigator:Kutz, Susan M. Licensed Year(s):
2005
Summary:
Wildlife in Arctic and sub-Arctic regions are very important renewable resources. Wildlife populations can be disturbed by wildlife diseases, and the people who harvest, handle and consume wildlife can be affected by wildlife diseases too (meat not good...
Principal Investigator:Smith, Barney Licensed Year(s):
2005
Summary:
In 2003, the Yukon Government, Department of Environment, in collaboration with the Aklavik Hunters and Trappers Committee and the Wildlife Management Advisory Committee (North Slope), interviewed several Aklavik Inuvialuit to determine the status of som...
Principal Investigator:Weagle, Ken V Licensed Year(s):
2005
2004 Summary:
The purpose of this fieldwork is to continue the collection of baseline data to support an anticipated application to the Mackenzie Valley Land and Water Board. There are four main components in the 2005 program: 1) Air quality, climate and noise asses...
Principal Investigator:Tonn, William Licensed Year(s):
2004
Summary:
This project will develop a long term monitoring strategy to access the seasonal productivity of wetlands in the breeding area. Preliminary sampling in 2004 will familiarize the incoming graduate student with the breeding pond region and allow various sa...
Principal Investigator:Robinson, Cindy Licensed Year(s):
2004
Summary:
This fieldwork is for reclamation planning at the Tundra Mine site. An aquatic survey will be conducted to characterize the current conditions of water bodies adjacent to the Tundra Mine and downstream of the mine's two tailings ponds. A total of seven l...
Principal Investigator:Bayha, Janet Licensed Year(s):
2004
20032002200120001998 Summary:
The Sahtu Settlement Harvest Study began as a 5-year project (1998-2003) in the five Sahtu Settlement communities. This Study is being continued in 2004 and 2005. Each month, in each community, a local interviewer recommended by the local Renewable Reso...
Principal Investigator:Uren, Shane Licensed Year(s):
2004
Summary:
The Expansion Project proposes to supply power to the Snap Lake, Gahcho Kue, Diavik and EKATI mine sites by expanding the existing infrastructure at the facilities on the Taltson River at Twin Gorges and at Nonacho Lake. Studies characterizing baseline e...
Principal Investigator:Sharpe, Seßn Licensed Year(s):
2003
Summary:
This work will assess the possible effects of expanding the Taltson hydroelectric generation facilities to supply power to the Snap Lake Diamond Mine. The existing facilities are on the Taltson River at Twin Gorges, located approximately 60 km NE of Fort...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
Summary:
Noise monitoring will be conducted at select potential locations for facilities, infrastructure and granular resources in the Deh Cho Region where there is the potential for noise affecting people and wildlife during the construction and operations of th...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
Summary:
Noise monitoring will be conducted at select potential locations for facilities, infrastructure, access roads and granular resources in the Sahtu Settlement Area where there is the potential for noise affecting people and wildlife during the construction...