Principal Investigator:Nearing, Michelle Licensed Year(s):
2021
Summary:
This licence has been issued for the scientific research application No.5047.
The objective of the study is to determine environmental conditions (in particular metal concentrations) and to compare existing conditions on and near the Rail Bed to background. The proposed field program will focus on collecting information that is considered critical for completing a human health and ecological ri...
Principal Investigator:Martin, Sandy D Licensed Year(s):
2006
Summary:
The study marks a continuation of Traditional Knowledge work initiated, as part of the Mackenzie Gas Project, with the community of Fort Good Hope in 2003. Local knowledge and technical/scientific research, in combination with a synthesis of existing technical information, is being used to develop a suitable knowledge base for planning, assessment of impacts and development of environmental protec...
Principal Investigator:Bekhuys, Tim Licensed Year(s):2006
2005
Summary:
De Beers Canada has conducted a number of baseline studies in the Gahcho Kue' area, and is continuing these studies in 2005. AMEC Earth and Environmental will be doing the baseline studies on behalf of De Beers. The studies will consist of wildlife, fi...
Principal Investigator:Robinson, Cindy Licensed Year(s):
2004
Summary:
This fieldwork is for reclamation planning at the Tundra Mine site. An aquatic survey will be conducted to characterize the current conditions of water bodies adjacent to the Tundra Mine and downstream of the mine's two tailings ponds. A total of seven l...
Principal Investigator:Uren, Shane Licensed Year(s):
2004
Summary:
The Expansion Project proposes to supply power to the Snap Lake, Gahcho Kue, Diavik and EKATI mine sites by expanding the existing infrastructure at the facilities on the Taltson River at Twin Gorges and at Nonacho Lake. Studies characterizing baseline e...
Principal Investigator:Sharpe, Seßn Licensed Year(s):
2003
Summary:
This work will assess the possible effects of expanding the Taltson hydroelectric generation facilities to supply power to the Snap Lake Diamond Mine. The existing facilities are on the Taltson River at Twin Gorges, located approximately 60 km NE of Fort...
Principal Investigator:Buckland, Laurie L Licensed Year(s):
2003
Summary:
The field studies are required to obtain specific environmental information for the study area and will be used in the preparation of baseline and environmental impact assessment reports in support of regulatory approvals. The study area is a 5 km wide...
Principal Investigator:Povey, Andrew Licensed Year(s):20042003
2002
Summary:
The vegetation component of the 2002 baseline studies will focus on completion of the vegetation typing surveys. Initially, a reconnaissance flight will be required along the study corridor. This flight will be used to identify sites for detailed sampling. Sites will be selected to represent the major ecological land units. Where possible, sample sites will be grouped to reduce helicopter time....
Principal Investigator:Johnstone, Robin Licensed Year(s):
1999
Summary:
The proposed field program is designed to provide site-specific information on stream crossings, for planned improvements to the Mackenzie Valley winter road route. Researchers will travel to the crossing sites by helicopter from the closest community. At each crossing location, habitat assessments, water quality samples and fish census techniques (outlined in the DFO fisheries research permit) m...
Principal Investigator:Machtans, Hillary Licensed Year(s):
1999
Summary:
The purpose of this study is to collect information about a variety ecosystems crossed by or in close proximity to the potential routes for a proposed pipeline. Fisheries and water quality studies will involve a survey of fish habitat, and of the water quality of any water bodies allong the proposed routes. Any fish collection will be outlined by Department of Fisheries and Oceans research permits...