18 record(s) found with the tag "water quality" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Pine Point Railbed ESA
Principal Investigator: Nearing, Michelle
Licensed Year(s): 2021
Summary: This licence has been issued for the scientific research application No.5047. The objective of the study is to determine environmental conditions (in particular metal concentrations) and to compare existing conditions on and near the Rail Bed to background. The proposed field program will focus on collecting information that is considered critical for completing a human health and ecological ri...


De Beers Canada Snap Lake Mine Environmental Monitoring 2021
Principal Investigator: McLean, Sarah C
Licensed Year(s): 2021
Summary: This licence has been issued for the scientific research application No.4858. The objective of the project is to conduct environmental monitoring of wildlife (incidental observations only), vegetation, air quality, hydrology, and aquatics in the Snap Lake study area. Methods used are outlined in the management and monitoring plans (aquatic effects monitoring program, water management plan [s...


Great Bear River Environmental and Traditional Knowledge Baseline Program
Principal Investigator: Lennie-Misgeld, Peter
Licensed Year(s): 2011 2010
Summary: The main objective of the program is to collect fisheries and environmental baseline information to better understand the environmental characteristics of the Great Bear River and to support potential future development of hydropower on the Great Bear River. The program is not being conducted to support a specific project as there are no hydropower projects planned for the Great Bear River at thi...


Gahcho Kue Project Studies
Principal Investigator: Bekhuys, Tim
Licensed Year(s): 2006 2005
Summary: Baseline studies in the Gahcho Kue (Kennady Lake) area, in conjunction with the DeBeers Gahcho Kue Diamond Mine Project, have been ongoing since 1998. AMEC Earth and Environmental has been contracted by DeBeers to conduct these studies. This year, independent of the Mackenzie Valley Environmental Impact Review Board's regulatory requirements*, two studies are planned to be conducted in the project...


Tammerlane Baseline Studies
Principal Investigator: Hoos, Rick
Licensed Year(s): 2006
Summary: The objective is to obtain sufficient baseline data to develop a lead and zinc mine adjacent to the old Pine Point property. The owl survey to identify species presence and breeding territories in the vicinity of the study area will include an evening broadcast-call program that will commence 0.5 hours after sundown to 0.5 hours before sunrise in April and May. This owl survey will target the Bor...


Environmental Baseline Studies, Tamerlane Ventures Inc., Pine Point Mining Project
Principal Investigator: Moore, Steve M
Licensed Year(s): 2005
Summary: The objective of the field program is to document baseline conditions within the study area to be used for a water licence and land use application towards development of a lead and zinc mine adjacent to the old Pine Point property. This includes completing Ecosystem Classification, Surface Water Quality Sampling, Fish Habitat Assessments, and a Wildlife Utilization and Diversity Study. Field s...


Baseline Data Collection, Courageous Lake Gold Project, Seabridge Gold Inc.
Principal Investigator: Weagle, Ken V
Licensed Year(s): 2005 2004
Summary: The purpose of this study is to collect environmental baseline data to support an anticipated application to the Mackenzie Valley Land and Water Board for the development of a gold mine at the Seabridge Gold Inc. property. The components of the program u...


Taltson Hydro Project; Expansion Baseline Studies and Water Effects Monitoring Program
Principal Investigator: Uren, Shane
Licensed Year(s): 2004
Summary: The Expansion Project proposes to supply power to the Snap Lake, Gahcho Kue, Diavik and EKATI mine sites by expanding the existing infrastructure at the facilities on the Taltson River at Twin Gorges and at Nonacho Lake. Studies characterizing baseline e...


Taltson River Hydro Power Supply to Snap Lake Diamond Mine Environmental Baseline Studies
Principal Investigator: Sharpe, Seßn
Licensed Year(s): 2003
Summary: This work will assess the possible effects of expanding the Taltson hydroelectric generation facilities to supply power to the Snap Lake Diamond Mine. The existing facilities are on the Taltson River at Twin Gorges, located approximately 60 km NE of Fort...


Environmental Assessment for Drilling and Access Development in the Fort Liard Area
Principal Investigator: Mears, Margaret
Licensed Year(s): 2002
Summary: Baseline studies will be conducted for the proposed wellsite, access roads and other related infrastructure. The objective of this study is to determine the presence or absence of fish habitat and wildlife in the vicinity of the proposed project. For the...


TOTAL PAGES: 2