Principal Investigator:Weagle, Ken V Licensed Year(s):2005
2004
Summary:
The purpose of this fieldwork is for the collection of baseline data to support an anticipated application to the Mackenzie Valley Land and Water Board. There are 5 main components of the program. 1) Air quality and climate; General air quality will be m...
Principal Investigator:Povey, Andrew Licensed Year(s):
2004
Summary:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. An option of the field...
Principal Investigator:Goad, Robin E Licensed Year(s):
2004
Summary:
Fortune Minerals is considering building an all-weather access road to their current expanded exploration program on the NICO property. This program will require environmental baseline surveys to augment existing information on species and habitat in the...
Principal Investigator:Povey, Andrew Licensed Year(s):
2004
20032002 Summary:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This project is for aqu...
Principal Investigator:Povey, Andrew Licensed Year(s):2005
2004
20032002 Summary:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This project is for aqu...
Principal Investigator:Andrade, Claudio Licensed Year(s):
2003
Summary:
The overall goal is to provide data on arsenic cycling in sub-aqueous sediments to better understand the potential environmental impacts within Yellowknife Bay and the long-term fate of arsenic. Important objectives of the project are to assess the stab...
Principal Investigator:Caughill, Dave Licensed Year(s):2004
2003
Summary:
The main objective of this study is to characterize environmental conditions and supplement existing environmental information for possible use in long-term (i.e., multi-year) Environmental Effects Monitoring (EEM) programs as required of the Giant and C...
Principal Investigator:Lariviere, James Licensed Year(s):
2003
Summary:
The objective of this fieldwork is to assess the non-renewable resources of the Richardson Mountains study area using geochemical sampling and analysis. This work is a requirement for the approval of the Gwich'in Land Use Plan by the federal government....
Principal Investigator:Sharpe, Seßn Licensed Year(s):
2003
Summary:
This work will assess the possible effects of expanding the Taltson hydroelectric generation facilities to supply power to the Snap Lake Diamond Mine. The existing facilities are on the Taltson River at Twin Gorges, located approximately 60 km NE of Fort...
Principal Investigator:Teichreb, Chris Licensed Year(s):2013201220112010200920082007200620052004
2003
Summary:
This work will assess the effects that mining may have on the aquatic environment of lakes within the Ekati claimblock as part of BHP Billiton's Aquatic Effects Monitoring Program. Data to be collected includes water quality, sediment quality, physical l...