Principal Investigator:Kokelj, Steven V Licensed Year(s):2006
2005
Summary:
Since the 1970's, the oil and gas industry has drilled at least 19 exploratory wells in the Kendall Island Bird Sanctuary (KIBS), but there is a shortage of field data describing environmental conditions at the well-sites and drilling-mud sumps. In Marc...
Principal Investigator:Mears, Margaret Licensed Year(s):
2002
Summary:
Nahendeh, with assistance from Alpine Environmental Consulting Ltd. and Golder Associates Ltd. was contracted on behalf of ChevronTexaco Corporation to conduct vegetation monitoring studies for the pipeline right-of-way from Chevron K-29 wellsite to the...
Principal Investigator:Marsh, Philip Licensed Year(s):200520042003
2002
20012000199919981997199619951994199319921990 Summary:
The primary objective of this project is to develop improved understanding of the fluxes of water and energy in northern regions, and to develop improved computer models of these processes. The Trail Valley Creek site will be accessed by helicopter and s...
Principal Investigator:Kershaw, G. Peter Licensed Year(s):2002200120001999
1998
19971996199519941993 Summary:
The main study objectives are to: 1) determine the status of permafrost landforms in the study area, and 2) determine long-term recovery after abandonment of the CANOL No. 1 project. Access during the summer is via the Yukon along the Canol Road through Macmillan Pass. Beyond the base camp mountain bikes and foot will be the means of transport. Automated microclimate stations powered by solar ene...
Principal Investigator:Squires Taylor, Cindy Licensed Year(s):1992
1991
Summary:
The Researcher will conduct a survey, approximately 30 km on either side of the Mackenzie River using satellite imagery. A classification will be undertaken of the area from the Mackenzie Delta to the Fort Simpson area, with wider zones along the east side to include proposed pipeline routes. The information can be plotted as colour maps to show the location of trap lines, forest fires or wildlife...
Principal Investigator:Smith, D.W. Licensed Year(s):
1978
Summary:
As part of a continuing study to assess biological changes to the terrain as a result of disturbances caused by drilling projects to: (1) revisit two oil well sites to collect samples of soil and plants; (2) revisit 3 or 4 oil well sites to collect samples of soil and plants....
Principal Investigator:Railton, John Licensed Year(s):
1974
Summary:
Study of vegetation at old mud spills resulting from past drilling operations, Mackenzie Delta, on behalf of Panarctic Oils Limited....