39 record(s) found with the tag "landscape assessment" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2003 Route and Site Selection in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Inuvialuit Settlement Region. During the flights, locations of important land features will be confirmed by...


2002 Terrestrial Studies in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2002
Summary: The vegetation component of the 2002 baseline studies will focus on completion of the vegetation typing surveys. Initially, a reconnaissance flight will be required over Sahtu Private Lands along the study corridor. This flight will be used to identify...


2002 Terrestrial Studies in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2002
Summary: The proposed research program involves terrestrial studies in the Gwich'in Settlement Area to be conducted during 2002. Initial Vegetation investigations were conducted in summer 2001 to classify vegetation along the study corridor. This classification...


2002 Terrestrial Studies in the Inuvialuit Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2002
Summary: The proposed research program involves terrestrial studies in the Inuvialuit Settlement Area to be conducted during 2002. Initial vegetation investigations were conducted in summer 2001 to classify vegetation along the study corridor. This classificatio...


The Snare River Mapping Project: parts of NTS 85O and 85N
Principal Investigator: Jackson, Valerie A
Licensed Year(s): 2002 2001 2000
Summary: The Snare River mapping project will define the structural, metamorphic, lithographical and geochemical bedrock characteristics of the area, providing an up-dated geological data base. The mapping team will be flown out by float plane from Yellowknife in...


Central Foreland NATMAP Project
Principal Investigator: Lane, Larry S
Licensed Year(s): 2002 2001 2000
Summary: The research team will resume mapping bedrock and surficial geology at 1:50,000 and 1:250,000 scales, continuing a project begun in the summer of 2000. The base of operations will be either at Fort Liard, or at an existing base camp on the southeastern La Biche River. Fly camps will be accessed by helicopter. Fly camps will be visited by 2-4 crew members for about 1 week. From the fly camps the ...


Thematic Structural, Stratigraphic and Geochronologic Studies of the Slave Structural Province.
Principal Investigator: Bleeker, Wouter
Licensed Year(s): 2000 1999 1998 1997 1996 1995 1994
Summary: The objective of this study is to improve the geological understanding of the Slave Geological Province in general and specific key areas in more detail (eg. areas northeast of Yellowknife known as the Sleepy Dragon Complex, the Acasta Gneiss Complex, the Courageous Lake area, etc.). Various rock types will be mapped and described and their role in the complex geological history of the Slave Prov...


Vegetation Mapping at Tuktuk Nogait National Park
Principal Investigator: Raillard, Martin
Licensed Year(s): 1998
Summary: This project will take place in Tuktuk Nogait National Park in 1998 and 1999. The objective of the project is to map the vegetation of the park. As many areas of the Park as possible will be hiked and the various vegetation communities along the hiking route will be put into one of several classes, and their exact geographical location recorded. Once the field season is over, these various geograp...


Ecological and geomorphological investigations in the alpine tundra of the Mackenzie Mountains, NWT.
Principal Investigator: Kershaw, G. Peter
Licensed Year(s): 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993
Summary: The main study objectives are to: 1) determine the status of permafrost landforms in the study area, and 2) determine long-term recovery after abandonment of the CANOL No. 1 project. Access during the summer is via the Yukon along the Canol Road through Macmillan Pass. Beyond the base camp mountain bikes and foot will be the means of transport. Automated microclimate stations powered by solar ene...


Prescribed fire and vegetation dynamics in the Slave River lowlands, N.W.T.
Principal Investigator: Quinlan, Allyson
Licensed Year(s): 1998
Summary: The principle researcher and one (or two) field assistants will be flown into Hook Lake base camp by either helicopter or fixed wing aircraft (transportation and field support confirmed by Renewable Resources, NWT). Temporary vegetation (herbaceous) transects will be established on the following prairies in the Hook Lake area: Dan's Prairie, North Prairie, Paul's Prairie, Ann's Prairie, Hook Lake ...


TOTAL PAGES: 4