Improving Habitat Connectivity to Enhance Productive Capacity of Arctic Freshwater Ecosystems
Principal Investigator: Tonn, William
Licensed Year(s): 2014 2013 2012 2011 2010 2009
Summary: The objectives of this research project are: to study the freshwater ecology, hydrology, and hydraulics of small lakes and streams in the Lac de Gras basin before habitat modification; to monitor the changes in ecosystem productive capacity resulting from habitat modifications designed to increase habitat connectivity and fish passage; and to assess the effectiveness of such habitat modifications ...


2006 -2007 Biophysical and Reconnaissance Studies in the Inuvialuit Settlement Region
Principal Investigator: Hawkins, Jim R.
Licensed Year(s): 2007
Summary: Several environmental and engineering studies were conducted between 2001 and 2006 to assess a proposed pipeline in the Mackenzie Valley. These studies will continue in 2007 and 2008. Route and site reconnaissance will be by helicopter, and crews will land at selected sites based on observations made during the flight. Reconnaissance surveys of road-water crossings will be performed. Pipeline-...


WO Diamond Project
Principal Investigator: Hamm, Sharleen
Licensed Year(s): 2006
Summary: In view of Peregrine Diamonds Ltd.’s move to advance the DO-27 kimberlite pipe of the WO Diamond Project to the pre-feasibility assessment phase, this project is proposed to collect baseline data that would contribute to an Environmental Assessment in subsequent years. Gartner Lee Ltd has been contracted to undertake field sampling, which will consist of examining surface water quality; hydrology;...


2006 Biophysical and Reconnaissance Studies in the Sahtu Settlement Area
Principal Investigator: Martin, Sandy D
Licensed Year(s): 2006
Summary: The proposed biophysical and reconnaissance studies are aimed at collecting data to assess the feasibility of constructing a potential oil and gas pipeline for the Mackenzie Gas Project. The 2006 work programme includes: route and site reconnaissance; aquatic and terrestrial studies; and engineering, geological and geophysical studies. Route and site reconnaissance comprise: verification of the ...


2006 Biophysical and Reconnaissance Studies in the Deh Cho Region
Principal Investigator: Martin, Sandy D
Licensed Year(s): 2006
Summary: The proposed biophysical and reconnaissance studies are aimed at collecting data to assess the feasibility of constructing a potential oil and gas pipeline for the Mackenzie Gas Project. The 2006 work programme includes: route and site reconnaissance; aquatic and terrestrial studies; and engineering, geological and geophysical studies. Route and site reconnaissance comprise: verification of the ...


Taltson Hydro Project; Expansion Baseline Studies and Water Effects Monitoring Program
Principal Investigator: Uren, Shane
Licensed Year(s): 2004
Summary: The Expansion Project proposes to supply power to the Snap Lake, Gahcho Kue, Diavik and EKATI mine sites by expanding the existing infrastructure at the facilities on the Taltson River at Twin Gorges and at Nonacho Lake. Studies characterizing baseline e...


Environmental Studies for Anadarko Canada Energy Ltd.'s Proposed East Liard Gas Gathering System
Principal Investigator: Buckland, Laurie L
Licensed Year(s): 2003
Summary: The field studies are required to obtain specific environmental information for the study area and will be used in the preparation of baseline and environmental impact assessment reports in support of regulatory approvals. The study area is a 5 km wide...


An Aquatic Effects Study for the Ferry Crossings near Tsiigehtchic and Ft. McPherson, NT
Principal Investigator: Parlee, Brenda L
Licensed Year(s): 2002 2001
Summary: The Aquatic Effects Study will include the general components of fisheries, water quality, river hydraulics, ferry landing operations, and traditional knowledge (TK). The specific Study objectives are as follows: (1) Complete an assessment of fish habitat quality including photographs; (2) Determine which fish species utilize the area; (3) Collect Gwich'in TK in relation to fish and fish habitat. ...


Development of Ecosystem Maintenance Indicators (EMI's) for the Peel, Liard and Slave Rivers.
Principal Investigator: MacDonald, Donald D.
Licensed Year(s): 1995
Summary: The T.E.K. component of the study will involve a series of interviews with residents in the Liard River basin. These interviews will be conducted by an interviewer who is competent in English and Slavey. The interviews will be recorded on audio tape and transcribed later onto the questionaire and maps. The communities will be provided with copies of all raw and summarized information....


Licence #2623
Principal Investigator: McLeod, Curtis
Licensed Year(s): 1980
Summary: To document fish use of shalllow side-channel areas or river margins and to estimate the effect of water level changes on fish habitat. Detailed physical data collection (water levels, velocity and sediment samples) will be undertaken, data will also be collected of fish and small invertebrate use of habitat....


TOTAL PAGES: 2