128 record(s) found with the tag "geological mapping" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2002 Route and Site Selection in the Deh Cho Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004 2003 2002
Summary: Route and site selection flights will be used to: (1) determine the location for a potential natural gas pipeline route and associated developments through the Deh Cho Region; (2) visually inspect and confirm land forms and geotechnical features; (3) identify land features that may be important to the location or construction of a potential gas pipeline; and (4) determine the locations for poten...


2002 Route and Site Selection in the Inuvialuit Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: Route and site selection flights will be used to: (1) determine the location for a potential natural gas pipeline route and associated developments through the Inuvialuit Settlement Area; (2) visually inspect and confirm land forms and geotechnical features; (3) identify land features that may be important to the location or construction of a potential gas pipeline; and (4) determine the locatio...


2002 Route and Site Selection in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: Route and site selection flights will be used to: (1) determine the location for a potential natural gas pipeline route and associated developments through the Gwich'in Settlement Area; (2) visually inspect and confirm land forms and geotechnical features; (3) identify land features that may be important to the location or construction of a potential gas pipeline; and (4) determine the locations...


2002 Route and Site Selection in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: Route and site selection flights will be used to: (1) determine the location for a potential natural gas pipeline route and associated developments through the Sahtu Settlement Area; (2) visually inspect and confirm land forms and geotechnical features; (3) identify land features that may be important to the location or construction of a potential gas pipeline; and (4) determine the locations fo...


Geological Survey in the Last Mountain, Dendale Lake, Jackfish Creek and LaBiche River Areas
Principal Investigator: Taylor, James
Licensed Year(s): 2001
Summary: The project team will be based in Ft. Liard, and travel in the field by Deh Cho Helicopters. The itinerary of the field is weather dependant. The duration of the proposed field studies will be from 10 August-26 August, 2001. Rock samples (fist sized) will be collected, and returned to the laboratory for detailed chemical analysis. Structural mapping will be traced on aerial photos and transferre...


Surficial Mapping of Tuktut Nogait National Park
Principal Investigator: Veillette, Jean
Licensed Year(s): 2001
Summary: Field work will consist of helicopter traverses run from two base camps, with stops at points of interest previously identified from air photos, and detailed traverses conducted from fly camps lasting from 4-6 days. Fly camps will be run by a two-man crew, positioned by helicopter, who will operate up to 10-15 km from the camp. Most field observations will be directed at identifying and counting ...


Alteration Study of the Giant Mine, Yellowknife
Principal Investigator: Hubbard, Laura
Licensed Year(s): 2001
Summary: The research team will be based out of Yellowknife, and travel to the Giant Mine site by motor vehicle. Detailed geological mapping will occur to enable the research team to understand the alteration and associated mineralization within the mine camp. Sampling of various rock types (ore, mineralized and un-mineralized) will be conducted with a hammer, with specimens collected ranging from 10-20 ...


Basin Analysis of the Liard Basin.
Principal Investigator: Jowett, David
Licensed Year(s): 2001
Summary: The research team will complete a study of the Cretaceous strata in the Liard Basin area, using micropaleontology, geochemistry and various correlation techniques. Fieldwork will begin on 1 June 2001, and continue through most of July. The research team will access remote rock outcrops by helicopter, or in some cases by inflatable boat on some of the major rivers (Liard River and Petitot River)....


Thematic Structural, Stratigraphic and Geochronologic Studies of the Slave Structural Province.
Principal Investigator: Bleeker, Wouter
Licensed Year(s): 2000 1999 1998 1997 1996 1995 1994
Summary: The objective of this study is to improve the geological understanding of the Slave Geological Province in general and specific key areas in more detail (eg. areas northeast of Yellowknife known as the Sleepy Dragon Complex, the Acasta Gneiss Complex, the Courageous Lake area, etc.). Various rock types will be mapped and described and their role in the complex geological history of the Slave Prov...


Central Foreland Project- Surficial Geology Mapping, La Biche Map Sheet.
Principal Investigator: Smith, Rod
Licensed Year(s): 1999
Summary: The purpose of the study is to continue the standard 1:50 000 geological mapping that was started in the summer of 1997 as per mandate of the Geological Survey of Canada. Parties will be sent out by helicopter from Fort Liard and most of the area will be visited only once. The primary method of fieldwork is by foot traverse. Observations will be recorded and small samples of rocks and sediments...


TOTAL PAGES: 13