Principal Investigator:Cott, Pete Licensed Year(s):
2005
Summary:
Winter seismic programs done in the Mackenzie Delta still use dynamite as an energy source under waterbodies not frozen to bottom. Exploding dynamite in or near fisheries waters can potentially impact fish. The main reasons for the study are as follows...
Principal Investigator:Kustan, Ed Licensed Year(s):
2004
Summary:
Following environmental impact assessments, the National Energy Board and the Mackenzie Valley Land and Water Board granted approvals to Paramount Resources Ltd. for the construction of specific infrastructure within the Significant Discovery Area. Atta...
Principal Investigator:Blasco, Steve M Licensed Year(s):20092008200720062005
2004
2003 Summary:
The Beaufort Seabed Mapping Project is designed to assess the environmental impact of offshore hydrocarbon exploration and transportation on the renewable resources of the Beaufort Sea. This project has 2 objectives: 1) seabed sampling using grab sampler...
Principal Investigator:Povey, Andrew Licensed Year(s):
2004
Summary:
This project is a continuation of socio-economic and traditional knowledge (TK) studies in the Trout Lake region which were initiated in 2002 as part of the baseline studies and assessment for the Mackenzie Gas Project. The primary focus of the socio-ec...
Principal Investigator:Turchenek, Larry Licensed Year(s):
2004
Summary:
The overall project objective is to collect information on the Gahcho KuÚ and 'control lake' areas for use in impact assessment and environmental protection planning for a proposed mine development. AMEC Earth and Environmental (AMEC) has been retained t...
Principal Investigator:Povey, Andrew Licensed Year(s):
2004
20032002 Summary:
Imperial Oil Resources Ventures Limited, Aboriginal Pipeline Group, ConocoPhillips Canada (North) Limited, Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This por...
Principal Investigator:Povey, Andrew Licensed Year(s):
2004
20032002 Summary:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This project is for aqu...
Principal Investigator:Povey, Andrew Licensed Year(s):
2004
20032002 Summary:
Imperial Oil Resources Ventures Limited, Aboriginal Pipeline Group, ConocoPhillips Canada (North) Limited, Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. Local k...
Principal Investigator:Millman, Pete Licensed Year(s):
2004
Summary:
This project has been initiated as a first step in selecting a pipeline route between the M18 gas discovery and Parsons Lake. While construction of a pipeline from M18 to Parsons Lake will not occur for several years, the LiDAR project will allow Devon t...
Principal Investigator:Christensen, Julia B Licensed Year(s):
2004
Summary:
This graduate research focuses on the application of Traditional Knowledge in environmental impact assessment in the NWT, with a specific focus on the Mackenzie Valley, and will identify the ways in which this application is linked to political, social,...