Principal Investigator:Chin, Krista Licensed Year(s):2017201620152014
2013
Summary:
Objective 1: Build a partnership between government, communities, regulators and researchers to develop a watershed-based cumulative impact study in areas of oil and gas exploration in the Sahtu region.
The Sahtu Renewable Resource Board (SRRB) can play an important coordinating role in bringing partners together and working with the communities to determine appropriate engagement in the projec...
Principal Investigator:Lacelle, Denis Licensed Year(s):
2013
2012 Summary:
This is a multidisciplinary project involving communities, governments and academic researchers. The goals are to: 1) inventory and track broad scale changes in landscape disturbances; 2) determine the impacts of natural and anthropogenic disturbances on the physical and chemical characteristics and ecology of streams and rivers; 3) determine disturbance thresholds relevant to the health of stream...
Principal Investigator:Harris, Katherine M. Licensed Year(s):201720162014
2013
201220112010200920082006200520042003 Summary:
The objective of this research project is to collect baseline environmental information for future environmental effects monitoring.
Surveys may include assessments of fish, fish habitat, benthic invertebrates, plankton, water and sediment quality, wetlands and geochemistry. Equipment for surveys will be limited to standard field measuring and surveying equipment, such as automated water qualit...
Principal Investigator:Kokelj, Steven V Licensed Year(s):2014
2013
201220112010 Summary:
The objective of this research project is to document the extent of ecological change in impacted stream basins draining the eastern slope of the Richardson Mountains and to determine the mechanisms of slump initiation and stabilization. This study will focus on the Stoney Creek catchment, which runs parallel to the Dempster Highway and empties into the Peel River at Fort McPherson, NT. The catchm...
Principal Investigator:Zawacky, Summer R Licensed Year(s):
2012
Summary:
The objective of this study is to complete comprehensive site investigations at each location (10 in total) to determine environmental and physical conditions. This will include the identification and quantification of environmental impacts in soil, sediment, surface water and groundwater, and the identification of any hazardous or non-hazardous materials left on site.
Columbia personnel will f...
Principal Investigator:Bathe, Adam Licensed Year(s):
2012
Summary:
Blyth & Bathe Inc purposes to conduct a Traditional Knowledge study that will serve as a starting point for the commencement of Devonian Metals’ environmental and socio-economic research, and will greatly improve the quality of data produced by the studies leading up to and during the permitting process.
Blyth & Bathe Inc, in conjunction with the Pehdzeh Ki First Nation (PKFN liaison), will dev...
Principal Investigator:McLachlan, Stephane M Licensed Year(s):
2012
2011 Summary:
The overall goal of this project is to better understand and communicate the implications of industrial activity associated with the Athabasca tar sands and large scale hydro developments for environmental and human health as it affects the downstream Aboriginal communities.
The team completed Phase One of this project (collection of video and interview materials related to observed changes in ...
Principal Investigator:Dallimore, Scott R Licensed Year(s):
2012
2011201020092008200720062004 Summary:
Field research for 2012 will concentrate on two tasks: 1) Continued characterization of gas seeps observed and reported by the National Energy Board, Geological Survey of Canada and Inuvialuit. 2) Data logger (water temperature, level, conductivity and dissolved oxygen) retrieval and redeployment.
The objectives of this program are:
1. to collect water and gas samples by-hand for subsequent la...
Principal Investigator:Cote, Jason E Licensed Year(s):
2011
Summary:
Fieldwork is required to determine the potential effects of a ramping event (sudden shutdown of the power generation facility) on fish and fish habitat within the lower reaches of the La Martre River. This information would be added to the overall fish and fish habitat effects assessment and will identify potential mitigation measures, if required. Specific objectives of the field program includ...
Principal Investigator:Krizan, Julia Licensed Year(s):
2011
Summary:
A Fish Habitat Assessment and an Archaeological Assessment are required for the proposed Inuvik to Tuktoyaktuk Highway. A Fish Habitat Assessment and an Archaeological Impact Assessment Report will be developed with data obtained from the proposed highway corridor during fall 2011.
IMG-Golder Corp. is proposing to carry out a fish habitat and archaeological assessment program along the highway ...