26 record(s) found with the tag "economic feasibility" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Taiga Adventure Camp Feasibility Study
Principal Investigator: Stirling, Mark
Licensed Year(s): 2011
Summary: The objectives of the project will be to evaluate the feasibility of the new offering. To determine the feasibility of the project the market, organizational capability, financial implications and strategic alliances will be evaluated. As part of the market analysis a survey will be conducted to evaluate the demand for the offering from the target demographic. To examine the market, descrip...


Wind Energy Monitoring in Norman Wells 2009-2010
Principal Investigator: Pinard, Jean-Paul
Licensed Year(s): 2010 2009 2008 2007
Summary: This licence is being issued for the scientific research application no. 1279. The objective of this wind monitoring proposal is to quantify the wind energy potential for the economic feasibility of building a wind farm in Norman Wells, a remote community that is dependant on gas-electric generation. The wind monitoring equipment was installed in September 2008 and this site will continue to...


Wind Energy Monitoring in Tuktoyaktuk NWT
Principal Investigator: Seccombe-Hett, Pippa
Licensed Year(s): 2008 2007
Summary: The objective of this wind monitoring proposal is to quantify wind energy potential for the economic feasibility of building a wind farm in Tuktoyaktuk. This year the proposed project will involve maintaining data collection at the wind monitoring site, as well as data analysis and reporting. The Tuktoyaktuk wind monitor will visit the wind tower site monthly and maintain the monitoring site e...


2006 Biophysical and Reconnaissance Studies in the Inuvialuit Settlement Region
Principal Investigator: Martin, Sandy D
Licensed Year(s): 2006
Summary: The proposed biophysical and reconnaissance studies are aimed at collecting data to assess the feasibility of constructing a potential oil and gas pipeline for the Mackenzie Gas Project. The 2006 work programme includes: route and site reconnaissance; aquatic and terrestrial studies; and engineering, geological and geophysical studies. Route and site reconnaissance comprise: verification of the ...


ISR Marine Exploratory Fishery
Principal Investigator: Stabler, James Matt
Licensed Year(s): 2005 2005
Summary: This is a continuation of the ISR exploratory fishery initiated in 2003. The program is part of a larger experimental fishery investigation aimed at providing information required to assess the potential of initiating small-scale, community-based commerc...


Building Capacity: Aurora College Teacher Education Program Review
Principal Investigator: Tymchak, Michael
Licensed Year(s): 2002
Summary: This review was initiated by Aurora College as part of explorations along with the Department of Education, Culture and Employment related to providing opportunities for northerners to complete the Bachelor of Education degree in the NWT. The project pur...


Devon Canada Test Ice Pad
Principal Investigator: Millman, Pete
Licensed Year(s): 2002
Summary: The primary objective of this work is to investigate whether a full scale insulated ice pad is economically, structurally, and environmentally feasible in the Mackenzie Delta for the purpose of an exploratory drilling program. The pad will be constructed...


Tuktoyaktuk Lake and Fish Habitat Survey
Principal Investigator: Jalkotzy, Peter
Licensed Year(s): 2001 2000
Summary: The research team will conduct a lake and fish habitat survey, to identify which water bodies have the following characteristics: overwintering fish, lake depths greater than 3.5 feet and water quality conditions which are not suitable for overwintering fish. The research team will consist of 3 crews, 4 men/crew. Crews will receive their safety and sampling orientation in Tuktoyaktuk Harbour at ...


Converging Ecological Currents: A First Nations Ecovisitor Strategy
Principal Investigator: Beddoes, Colin
Licensed Year(s): 2000 1999
Summary: This study will assist Gameti First Nation in preparing a tourism action plan and an analysis of the opportunities and constraints that are faced in the implementation of ecocultural tourism. Transportation to and on site will be by air. Data collection will be carried out while working under the direction of a consultant. Data collection will involve non-structured interviews and may involve ...


Constraints to Multi-Stakeholder Collaboration in the Development of a Sustainable Tourism Industry
Principal Investigator: Pisani, Shane
Licensed Year(s): 1998
Summary: My research collection will be comprised of both interviews for key stakeholders and surveys amongst all stakeholders in the tourism industry. I am anticipating beginning interviews and surveys in early August and completing the research by mid-September 1998. The interviews and surveys will involve government agencies and nongovernmental organizations (NGO's)- no individual names will be used. T...


TOTAL PAGES: 3