Principal Investigator:Gall, Patrick N. Licensed Year(s):
2022
2021202020192018 Summary:
This licence has been issued for the scientific research application No.5159.
The objective of this wind monitoring proposal is to continue to measure the wind energy potential at CN Hill (approximately 130 km from Yellowknife) until the site is next serviced and the equipment removed. This is part of an alternative energy study for the Yellowknife area. Wind data will be collected using instru...
Principal Investigator:Dares, Matthew J Licensed Year(s):
2020
20192018 Summary:
This licence has been issued for the scientific research application No.4692.
The objective of this wind monitoring proposal is to develop further insight into the wind energy potential for the economic feasibility of building a wind farm in Norman Wells, a remote community that is dependent on gas-electric generation.
A 60m meteorological tower will be installed in September 2018. This towe...
Principal Investigator:Trimble, Annika EV Licensed Year(s):
2017
20162015 Summary:
The objective of this wind monitoring proposal is to measure the wind energy potential at CN Hill (approximately 130 km from Yellowknife) for two years. This is part of an alternative energy study for the Yellowknife area. Wind data will be collected using instruments that measure wind speed, direction, and temperature. At CN Hill, the sensors will be installed on an existing Northwestel Tower. Tw...
Principal Investigator:Trimble, Annika EV Licensed Year(s):201820172016201520152014
2013
Summary:
The objective of this wind monitoring proposal is to measure the wind energy potential at the Inuvik high point (approximately 6 km northeast of the Inuvik airport) for two years. This is part of an alternative energy study for the Inuvik area. Wind data will be collected using instruments on a wind tower that will be installed at the site. Two full years of wind measurements and an economic analy...
Principal Investigator:Trimble, Annika EV Licensed Year(s):20142013
2012
Summary:
The objective of this wind monitoring proposal is to measure the wind energy potential at Storm Hills for two years, as part of an alternative energy study for the Inuvik area. Wind data will be collected using an existing infrastructure (New North Networks tower) at the site.
A desktop study was recently completed for Inuvik and the surrounding area at the request of the Minister of Environme...
Principal Investigator:Trimble, Annika EV Licensed Year(s):
2012
201120102009 Summary:
The objective of this wind monitoring proposal is to continue quantifying the wind energy potential for the economic feasibility of installing a wind turbine as a part of the Avalon Rare Metals Inc. development near Thor Lake. Due to equipment problems, no data was collected during the winter months of the last two years. The monitoring equipment has now been replaced and we aim to capture this im...
Principal Investigator:Trimble, Annika EV Licensed Year(s):20142013
2012
2011 Summary:
To measure solar irradiance levels in Jean Marie River and Ft. Providence, in order to support pre-feasibility studies on the use of solar energy in those communities.
The project engineer will travel to Jean Marie River and Fort Providence to start monitoring solar irradiance in the two communities. The monitoring units will likely be placed on a GNWT building in Fort Providence, and on the ba...
Principal Investigator:Pinard, Jean-Paul Licensed Year(s):
2010
200920082007 Summary:
This licence is being issued for the scientific research application no. 1279.
The objective of this wind monitoring proposal is to quantify the wind energy potential for the economic feasibility of building a wind farm in Norman Wells, a remote community that is dependant on gas-electric generation.
The wind monitoring equipment was installed in September 2008 and this site will continue to...
Principal Investigator:Seccombe-Hett, Pippa Licensed Year(s):
2008
2007 Summary:
The objective of this wind monitoring proposal is to quantify wind energy potential for the economic feasibility of building a wind farm in Tuktoyaktuk.
This year the proposed project will involve maintaining data collection at the wind monitoring site, as well as data analysis and reporting.
The Tuktoyaktuk wind monitor will visit the wind tower site monthly and maintain the monitoring site e...
Principal Investigator:Millman, Pete Licensed Year(s):
2002
Summary:
The primary objective of this work is to investigate whether a full scale insulated ice pad is economically, structurally, and environmentally feasible in the Mackenzie Delta for the purpose of an exploratory drilling program. The pad will be constructed...