7 record(s) found with the tag "economic feasibility" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Wind Monitoring in Norman Wells, NT
Principal Investigator: Dares, Matthew J
Licensed Year(s): 2020 2019 2018
Summary: The objective of this wind monitoring proposal is to develop further insight into the wind energy potential for the economic feasibility of building a wind farm in Norman Wells, a remote community that is dependent on gas-electric generation. A 60 m meteorological tower will be installed in September 2018. This tower is equipped with both heated and unheated anemometers and wind vanes at 40 m, ...


Wind Energy Monitoring at Snare Hill
Principal Investigator: Dares, Matthew J
Licensed Year(s): 2022 2021 2020 2019 2018
Summary: The objective of this wind monitoring proposal is to continue to measure the wind energy potential at CN Hill (approximately 130 km from Yellowknife) until the site is next serviced and the equipment removed. This is part of an alternative energy study for the Yellowknife area. Wind data will be collected using instruments that measure wind speed, direction, and temperature. Sensors are already in...


Wind Energy Monitoring at Yellowknife (2015-2017)
Principal Investigator: Trimble, Annika EV
Licensed Year(s): 2017 2016 2015
Summary: The objective of this wind monitoring proposal is to measure the wind energy potential at CN Hill (approximately 130 km from Yellowknife) for two years. This is part of an alternative energy study for the Yellowknife area. Wind data will be collected using instruments that measure wind speed, direction, and temperature. At CN Hill, the sensors will be installed on an existing Northwestel Tower. Tw...


Wind Energy Monitoring at Inuvik High Point (2013-2015)
Principal Investigator: Trimble, Annika EV
Licensed Year(s): 2018 2017 2016 2015 2015 2014 2013
Summary: The objective of this wind monitoring proposal is to measure the wind energy potential at the Inuvik high point (approximately 6 km northeast of the Inuvik airport) for two years. This is part of an alternative energy study for the Inuvik area. Wind data will be collected using instruments on a wind tower that will be installed at the site. Two full years of wind measurements and an economic analy...


Wind Energy Monitoring at Thor Lake 2010-2011
Principal Investigator: Trimble, Annika EV
Licensed Year(s): 2012 2011 2010 2009
Summary: The objective of this wind monitoring proposal is to continue quantifying the wind energy potential for the economic feasibility of installing a wind turbine as a part of the Avalon Rare Metals Inc. development near Thor Lake. Also, to carry out a second year of wind data collection to confirm early predictions on the viability of wind energy for the Thor Lake mine site. The project engineer h...


Wind Energy Monitoring in Tuktoyaktuk NWT
Principal Investigator: Seccombe-Hett, Pippa
Licensed Year(s): 2008 2007
Summary: The objective of this wind monitoring proposal is to quantify wind energy potential for the economic feasibility of building a wind farm in Tuktoyaktuk. This year the proposed project will involve maintaining data collection at the wind monitoring site, as well as data analysis and reporting. The Tuktoyaktuk wind monitor will visit the wind tower site monthly and maintain the monitoring site e...


Wind Energy Monitoring in Norman Wells
Principal Investigator: Seccombe-Hett, Pippa
Licensed Year(s): 2010 2009 2008 2007
Summary: The objective of this proposal is to quantify the wind energy potential for the economic feasibility of building a wind farm in Norman Wells. This project will involve a site inspection, installation of wind tower and wind monitoring equipment (a 50m tower with 6 calibrated anemometers positioned at 10m, 20m, 30m, 40m and two at 50m level, a wind vane and temperature sensors), and data collecti...