14 record(s) found with the tag "ecological risk assessment" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Development in the Coppermine River basin and Cumulative Effects Monitoring
Principal Investigator: Whitney, Candace
Licensed Year(s): 2000
Summary: The Coppermine River basin has significant mineral resources including diamonds as well as base and precious metals. In the early 1990s, the Slave Geological Province experienced a dramatic increase in mining activity when diamonds were discovered in the middle of the West Kitikmeot/Slave area at Lac de Gras. Northern ecological systems are particularly at risk to impacts of mining and other land...


Wildlife and Fisheries Habitat Survey at Ranger Oil's Exploratory Drilling Project near Tulita (Fort Norman).
Principal Investigator: Melton, Derek
Licensed Year(s): 1997
Summary: Main objective is to establish baseline wildlife & fisheries habitat conditions prior to start of Ranger Oil's winter exploration drilling program. All sampling will be done over a 2-3 day period in mid-September. Three well sites are planned for drilling. Well site 1 is near Nota Creek & accessed by the Norman Wells-Tulita winter road plus an existing short cutline. Well site 2 is near Bear Rock ...


Delineation of Komokuk Beach (BAR-1), and Nicholson Peninsula (BAR-4).
Principal Investigator: Reimer, Kenneth J.
Licensed Year(s): 1997
Summary: The Environmental Services Group has been requested by Defence Construction Canada and DCLU, to continue conducting environmental investigations of former DEW Line sites. Personnel will collect soil, sediment, plant, water, paintchips and insulation samples from areas of suspected or known contamination. The samples will be analyzed for inorganic elements and PCB's. In addition a small-scale bio...


Ecological & geomorphological investigations in the alpine tundra of the western Mackenzie Mountains
Principal Investigator: Kershaw, G. Peter
Licensed Year(s): 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993
Summary: Access during the summer is via the Yukon along the Canol Road through Macmillan Pass. In the spring and winter fixed wing access is arranged from Tulita. Automated microclimate stations powered by solar energy cells operate year-round. The base camp at Camp 222 includes solar cells to power laptop computers. Three field data collection visits are planned: May-June, July-August and February. ...


TOTAL PAGES: 2