5 record(s) found with the tag "ecological risk assessment" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2003 Spring, Summer and Fall Aquatic Surveys in the Deh Cho Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004 2003 2002
Summary: The research team will conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Deh Cho Region as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic investigations initia...


2003 Spring, Summer and Fall Aquatic Studies in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The research team proposes to conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Sahtu Settlement Area as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic investi...


2003 Spring, Summer and Fall Aquatic Studies in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The research team proposes to conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Gwich'in Settlement Area as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic inve...


2003 Spring, Summer and Fall Aquatic Studies in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The research team proposes to conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Inuvialuit Settlement Region as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic...


Delineation of Komokuk Beach (BAR-1), and Nicholson Peninsula (BAR-4).
Principal Investigator: Reimer, Kenneth J.
Licensed Year(s): 1997
Summary: The Environmental Services Group has been requested by Defence Construction Canada and DCLU, to continue conducting environmental investigations of former DEW Line sites. Personnel will collect soil, sediment, plant, water, paintchips and insulation samples from areas of suspected or known contamination. The samples will be analyzed for inorganic elements and PCB's. In addition a small-scale bio...


TOTAL PAGES: 1