Principal Investigator:Prather, Colleen Licensed Year(s):2021
2020
2019201820172016201520142012201120102009200820072006200520042002200120001999 Summary:
This licence has been issued for the scientific research application No.4635.
The objective of this research are to conduct environmental monitoring of wildlife, vegetation, air quality, hydrology, and aquatic effects in the Snap Lake study area. The research team will collect incidental observational data of wildlife near the Snap Lake Mine.
Through this project the research team will coll...
Principal Investigator:Wen, Marc Licensed Year(s):
2013
Summary:
The objective of the proposed studies to be conducted at Courageous Lake is to collect baseline data collection is planned to characterize the environmental (physical and biological) and social and economic setting in the proposed project area. Specifically, data collection is planned to characterize the following environmental components: air quality, noise, hydrology, bathymetry, hydrogeology, a...
Principal Investigator:Weagle, Ken V Licensed Year(s):2005
2004
Summary:
The purpose of this fieldwork is for the collection of baseline data to support an anticipated application to the Mackenzie Valley Land and Water Board. There are 5 main components of the program. 1) Air quality and climate; General air quality will be m...
Principal Investigator:Armitage, Derek Licensed Year(s):2005
2004
Summary:
The Slave River Delta is one of a series of important delta ecosystems in the Mackenzie Basin. The adjacent community of Fort Resolution depends on its high biological productivity and diversity for both food and resources. Recent and predicted changes i...
Principal Investigator:Moore, Peter Licensed Year(s):
2002
Summary:
The objective of this study is to collect detailed baseline information on several seasonal streams and ponds on BHP Billiton's Ekati Claim Block, confirm the presence or absence of various fish species in the proposed areas, and determine their value as...
Principal Investigator:Monita, Darwin Licensed Year(s):
2001
Summary:
The aquatic assessment is scheduled for September and October, 2001, and will focus on three lakes in the Chevron Canada Resources 2001/2002 seismic program areas in the Ellice 3-D, Mallik 3-D and Ogruknang 3-D blocks. All lakes examined will exceed 400m in width. No field camps will be used, all garbage will be packed out, and all human waste buried. The field crew will include a senior fisheri...
Principal Investigator:Moore, Peter Licensed Year(s):
2001
Summary:
Fish will be collected and released live using seining and electro-fishing techniques. Data collection will also include flow monitoring. All assessments will be completed on watercourses within the Misery Road, Sable Lake Road and Fox Lake Road developments within the mine site. BHP will provide support staff which will include people hired locally....
Principal Investigator:MacDonald, Gord Licensed Year(s):
1997
Summary:
Activities at the Damoti Lake Project Site will be as follows; 1) Archaeology - short site visit with field survey, 2) Terrestrial work will emphasize vegetation types and their value as wildlife habitat. Specific surveys for signs of moose, furbearers, raptors and other species, 3) Aquatic studies will emphasize habitat values in both lake and stream locations. Water quality work, 4) Hydrology w...
Principal Investigator:Bocking, Stephen Licensed Year(s):
1994
1993 Summary:
The researchers will complete their data collection activities in the NWT. All available literature on Mackenzie Basin aquatic science and environmental management will be catalogued and reviewed in order to identify appropriate criteria for the evaluation of aquatic science activities in the region. The results of this study will assist in coordinating existing and future research activities as...
Principal Investigator:Stewart, D. Bruce Licensed Year(s):
1982
Summary:
To conduct an aquatic resource survey which will include gathering, updating and compiling information on fish resources and human usage....