5 record(s) found with the tag "DEW line" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

DEW Line Passage: Tracing the Legacies of Arctic Militarization
Principal Investigator: Fritz, Stacey A.
Licensed Year(s): 2008
Summary: This licence was issued for the application no. 832. The objective of this study is to investigate what people think about the DEW Line radar stations, and write a dissertation that describes how the DEW Line impacted the Arctic socially and environmentally. The researchers will be traveling across the Arctic coast by canoe equipped with sail rigs. They are driving to Fort McPherson from Al...


Delineation of Komokuk Beach (BAR-1), and Nicholson Peninsula (BAR-4).
Principal Investigator: Reimer, Kenneth J.
Licensed Year(s): 1997
Summary: The Environmental Services Group has been requested by Defence Construction Canada and DCLU, to continue conducting environmental investigations of former DEW Line sites. Personnel will collect soil, sediment, plant, water, paintchips and insulation samples from areas of suspected or known contamination. The samples will be analyzed for inorganic elements and PCB's. In addition a small-scale bio...


Environmental Study of Abandoned DEW Line Sites.
Principal Investigator: Reimer, K.J.
Licensed Year(s): 1994 1993
Summary: The researchers will collect soil/sediment, water, plant and other biological samples to investigate small-scale variations of introduced substances; to examine larger variations in tundra and marine ecosystems; and to aid decision-makers in identifying when and where remedial measures can be most effectively applied. This investigation will be conducted on abandoned DEW Line sites to evaluate th...


Preliminary site investigations for the design and cost estimating of the clean up protocol of DEW Line Sites
Principal Investigator: Washuta, A.S.
Licensed Year(s): 1993 1992
Summary: The information gathered at the ten NWT DEW Line Sites will be used to prepare detailed Contract Documents for each site's environmental clean up. During the site visits, the researchers will conduct overall site surveys and identify areas or structures requiring either clean up or demolition. The sites to be visited are Nicholson Pen., Clinton Pt., Cp. Young, Byron Bay, Jenny Lind Isl., Gladman...


Large Aperture Coherence Project
Principal Investigator: Morris, John B.
Licensed Year(s): 1990 1989
Summary: Mr. Morris will conduct an experiment to explore the limitations imposed on antenna size due to the propagation medium. Long range antennae that "see" beyond the earth's curvature provide advanced notice of approaching targets....


TOTAL PAGES: 1