Principal Investigator:McLafferty, Carly A Licensed Year(s):2010
2007
2006 Summary:
The aim of this PhD research project is to examine resource decision-making processes associated with proposals for the Mackenzie Gas Project. A main objective of this research is to explore the effectiveness of consultation and environmental assessment processes in addressing the values and needs of Sahtu communities; thus, the focus of this study is on local community conceptions of environment...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
The objective of this study is to complete several helicopter flights for the purposes of pipeline and site reconnaissance and geotechnical observation. The activities will be conducted to: review the proposed location for a potential gas pipeline through the Sahtu Settlement Area (SSA), including identifying areas where mitigation measures may be required during or after construction such as stee...
Principal Investigator:Graburn, Larry Licensed Year(s):
2005
Summary:
A field office will be set up in Norman Wells. Primary access to the field is the winter road that extends north of Wrigley to Fort Good Hope. Two temporary rig camps will be set up, one near the Hamlet of Tulita and the other near the intersection of...
Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
2002 Summary:
The research team proposes to conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Sahtu Settlement Area as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic investi...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
Summary:
Noise monitoring will be conducted at a potential facility location near Fort Good Hope and near the Blackwater River. These data will provide estimates of current background ambient noise in the project area, prior to construction of the Mackenzie Gas P...
Principal Investigator:Bush, Dana Licensed Year(s):
2001
Summary:
The BC Terrestrial Ecosystem Mapping inventory standard will be used to provide a uniform method of describing vegetation, soil and terrain based on air photo interpretation and field data collection. The sampling sites will be located on Crown Land contained within a 1 km corridor with 'bulges' in areas of special concern such as river crossings. Surveying sites accessed by helicopter, boat, veh...
Principal Investigator:Fairbarns, Matt Licensed Year(s):
1984
Summary:
To choose study sites for work to be done next Spring on investigation of vegetation-permafrost-microclimate relationships associated with subarctic pipeline disturbances....
Principal Investigator:Harry, David Licensed Year(s):
1984
Summary:
A project directed toward the prediction and monitoring of geomorphic and geologic conditions along the route of the Norman Wells-Zama pipeline. Fieldwork will focus on observations of terrain performance along the pipeline ROW following the 1983/84 winter construction season....
Principal Investigator:Davison, D.M. Licensed Year(s):
1975
Summary:
(1) To gather field data in order to assess drainage and erosion control and to evaluate the stability of slopes along the proposed Foothills Pipeline and at key river crossings; (2) To gather subsurface soil and ice information to analyze typical slope conditions for pipe support designs for Foothills Pipeline Limited....