2 record(s) found in the location "Sahtu Settlement Area" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Hydrogeological investigation of the treatment performance of subsurface wastewater treatment systems in the NWT
Principal Investigator: Jamieson, Rob
Licensed Year(s): 2024 2023 2022
Summary: This licence has been issued for the scientific research application No.5413. The overall objective of this study is improved understanding of wastewater effluent transport within permafrost environments in the NWT. The proposed study aims to answer the following questions: 1) What is the potential for contamination of groundwater and receiving waters through active layer transport of effluent...


Contaminated Site Environmental Monitoring and Assessment - Port Radium, Contact Lake and El Bonanza Historic Mining Operations
Principal Investigator: Wiatzka, Gerd M
Licensed Year(s): 2009 2008 2007 2006 2005
Summary: The project objectives include the collection of information on: water and groundwater, sediment, benthic invertebrates, fish (species presence/abundance, quality, habitat), vegetation, soil/tailings/wasterock, radiological characterization, mine openings, infrastructure and general site conditions. Environmental sampling and monitoring work at the Port Radium site is a continuation of activities ...


TOTAL PAGES: 1