24 record(s) found in the location "North Slave Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Mapping and Modeling Carbon Flux in Northern Canada Related to Land Use Change
Principal Investigator: Chen, Wenjun
Licensed Year(s): 2005 2004
Summary: The research team is working to become familiar with the impact of human disturbances on vegetation in northern Canada for their carbon studies. The objective of this study is to collect vegetation and biophysical data for use as verification of ground cover type and disturbance for use in satellite imagery classification and biomass and soil sampling for carbon modeling along the Ingraham Trail....


2000 Years of Climate Change at Treeline North of Yellowknife
Principal Investigator: MacDonald, Glen M
Licensed Year(s): 2005
Summary: The researchers believe that the treeline zone is one of the most sensitive areas on earth to temperature changes, both natural and caused by global warming. They would like to take a small core (5 cm diameter) from the mud at the bottom of two small lakes close to Back Lake, northeast of Yellowknife. In the laboratory, they will analyze the cores for temperature-sensitive aquatic insect remains...


Gahcho Kue' Biophysical Baseline Studies
Principal Investigator: Bekhuys, Tim
Licensed Year(s): 2006 2005
Summary: De Beers Canada has conducted a number of baseline studies in the Gahcho Kue' area, and is continuing these studies in 2005. AMEC Earth and Environmental will be doing the baseline studies on behalf of De Beers. The studies will consist of wildlife, fi...


Environmental Investigations for Reclamation Planning at the Tundra Mine
Principal Investigator: Robinson, Cindy
Licensed Year(s): 2004
Summary: This fieldwork is for reclamation planning at the Tundra Mine site. An aquatic survey will be conducted to characterize the current conditions of water bodies adjacent to the Tundra Mine and downstream of the mine's two tailings ponds. A total of seven l...


2004 Vegetation and Soil Surveys in the Gahcho KuÚ (Kennady Lake) Area
Principal Investigator: Turchenek, Larry
Licensed Year(s): 2004
Summary: The overall project objective is to collect information on the Gahcho KuÚ and 'control lake' areas for use in impact assessment and environmental protection planning for a proposed mine development. AMEC Earth and Environmental (AMEC) has been retained t...


Taltson Hydro Project; Expansion Baseline Studies and Water Effects Monitoring Program
Principal Investigator: Uren, Shane
Licensed Year(s): 2004
Summary: The Expansion Project proposes to supply power to the Snap Lake, Gahcho Kue, Diavik and EKATI mine sites by expanding the existing infrastructure at the facilities on the Taltson River at Twin Gorges and at Nonacho Lake. Studies characterizing baseline e...


Taltson River Hydro Power Supply to Snap Lake Diamond Mine Environmental Baseline Studies
Principal Investigator: Sharpe, Seßn
Licensed Year(s): 2003
Summary: This work will assess the possible effects of expanding the Taltson hydroelectric generation facilities to supply power to the Snap Lake Diamond Mine. The existing facilities are on the Taltson River at Twin Gorges, located approximately 60 km NE of Fort...


The Reproductive and Developmental Toxicity of Arsenic in Mine Waste Soils on the Earthworm (Eisenia fetida andrei)
Principal Investigator: Wong, Stephen
Licensed Year(s): 2001
Summary: The research team will examine soils which will be collected by DIAND Contaminants Division staff from Yellowknife. Approximately 20 kg of contaminated soil will be collected from a site close to the Con Mine. As well, approximately 80 kg of uncontaminated soil (for use as a reference soil) will be collected from a site adjacent to the Rae Highway. All soils will be returned to a laboratory at ...


Anticancer Agents from Microorganisms
Principal Investigator: Pettit, George
Licensed Year(s): 1999 1995
Summary: The overall goal of this project is to collect a variety of soil samples from easily accessed locations in the NWT. Small soil and mud samples will be taken along NWT highways 1,3, and 7 during the late summer. All travel will be on highways, with actual collections made on foot. Soil samples will consist of only a few grams of material at each location. The samples will be taken to the University...


Phase 2 Environmental Baseline Program: Aber/Kennecot Southwest Diavik Property, Lac de Gras, NWT
Principal Investigator: Bryant, Wayne
Licensed Year(s): 1996 1995
Summary: The researchers will be involved in a mult-disciplined, integrated and focused series of investigation regarding water quality, hydrology and climatology, fisheries, aquatic, wildlife, vegetation, soils and terrain, and heritage resources. Taken with complementary socio-economic, traditional knowledge and environmental management investigations, this data will be used to prepare an environmental ...


TOTAL PAGES: 3