City of Yellowknife Gold Project
Principal Investigator: Campbell, Joseph W
Licensed Year(s): 2018 2017 2016 2015 2014
Summary: Follow-up on exploration activity associated with Mackenzie Valley Land and Water Board land use permit MV2014C0005 on Terrax Minerals Inc. City of Yellowknife Gold Project. Work would include initial environmental baseline work, and expansion of research programs to establish sufficient study for possible future Environmental Impact Assessment of potential mine development if exploration activiti...


Ecological Conditions in the Proposed Discharge Route of the Colomac Mine, NT
Principal Investigator: McGurk, Michael
Licensed Year(s): 2005 2004
Summary: The researchers will measure water quality, aquatic ecology and the status of fish populations in ponds and lakes along the proposed discharge route of mine water from the Colomac Mine (North Pond, L-Shaped Lake, Paddle Lake, Lake 315, and Lower Lake) and compare those data with data collected from reference lakes (Steeves Lake, Baton Lake, and Spanner Lake). Work will include taking three samples...


Environmental Surveys for the Fortune Minerals NICO Project
Principal Investigator: Goad, Robin E
Licensed Year(s): 2017 2016 2014 2013 2012 2011 2010 2009 2008 2006 2005 2004 2003
Summary: Fortune Minerals is considering an expanded exploration program on the NICO property, which will include building an all-weather access road. This program will require environmental baseline surveys to augment existing information on species and habitat...


Environmental Surveys for the Proposed All-Weather Access Road to Fortune Minerals NICO Project
Principal Investigator: Goad, Robin E
Licensed Year(s): 2004
Summary: Fortune Minerals is considering building an all-weather access road to their current expanded exploration program on the NICO property. This program will require environmental baseline surveys to augment existing information on species and habitat in the...


Baseline Limnology Program, Kennady Lake 2001 Environmental Program
Principal Investigator: Lawson, Nick
Licensed Year(s): 2001
Summary: The objectives of the research team are to collect baseline environmental information on the DeBeers Canada Exploration Ltd. project at Kennady Lake, to assist with the current environmental management of the property and prepare for an assessment of the environmental effects of potential future development of the site. Three field visits to Kennady Lake will be completed during the summer of 200...


Gazelle Lake and Point Lake Preliminary Baseline Study
Principal Investigator: Bryant, Wayne
Licensed Year(s): 1998
Summary: The Gazelle environmental baseline study will include specific investigations on water/sediment quality, lake bathymetry, limnology, catchment hydrology, fisheries and fish habitat assessment. Field data collection and observations will take about two to three days. Field staff of 3 will be transported by air to Ekati from Yellowknife. From Ekati, helicopter transport will be used to drop off the...


Phase 3 Environmental Baseline Program, Diavik Diamond Project, Lac de Gras, NWT
Principal Investigator: Digel, Mark
Licensed Year(s): 1996 1995
Summary: Methods of data collection will include water quality and bottom sampling in Lac de Gras and Lac du Sauvage; automatic and manual water level recordings; bathometric work; automatic weather stations and the monitoring of air-borne particles and visibility; continuation of baseline studies of soils and terrain, and vegetation; fish population, habitat, health, and spawning habits studies; baseline ...