7 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2006 -2007 Biophysical and Reconnaissance Studies in the Inuvialuit Settlement Region
Principal Investigator: Hawkins, Jim R.
Licensed Year(s): 2007
Summary: Several environmental and engineering studies were conducted between 2001 and 2006 to assess a proposed pipeline in the Mackenzie Valley. These studies will continue in 2007 and 2008. Route and site reconnaissance will be by helicopter, and crews will land at selected sites based on observations made during the flight. Reconnaissance surveys of road-water crossings will be performed. Pipeline-...


2005 Winter and Spring Aquatic Studies in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003
Summary: The researchers did a number of baseline studies during 2001 through 2004 as part of the Mackenzie Gas Project. These studies are continuing in 2005. Local knowledge and technical/scientific research is being used to design plans, assess impacts, and develop environmental protection plans. The aquatics field crews will consist of two Mackenzie Project Environment Group researchers and a local as...


Snow accumulation/runoff in high latitude permafrost basins
Principal Investigator: Marsh, Philip
Licensed Year(s): 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992 1990
Summary: The primary objective of this project is to improve understanding of the changes in water and energy in northern regions, and to develop improved computer models of these processes. The Trail Valley Creek, Hans Creek, and Zed Creek sites will be accessed...


2002 Aquatic Studies in the Inuvialuit Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Inuvialuit Settlement Area. The research team will survey 14 permanent watercourses, as well as several intermittent or seasonal watercourses and approximately 20 lakes located along the study corridor to determine aquatic characteri...


2002 Aquatic Studies in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Gwich'in Settlement Area. All aquatic studies will be conducted by three or four-person crews. Each crew will include a local researcher or Renewable Resource Council (RRC) representative. Depending upon accessibility, sites will b...


Alaskan Gas Producers Pipeline Team Environmental Studies for the Portion of the Proposed Mackenzie Valley Pipeline Route Within the Gwich'in Settlement Area.
Principal Investigator: Collard, Tod
Licensed Year(s): 2001
Summary: The proposed field research program within the Gwich'in Settlement Area will include the following general areas of study: (1) freshwater aquatics (freshwater fish and their habitats, water quality, hydrology); (2) terrestrial wildlife, including waterfowl; (3) vegetation and soils; (4) archaeology; and (5) noise. For all studies, access will be by helicopter, boat or on foot, as appropriate. Mo...


Licence #2449
Principal Investigator: Sherstone, David A.
Licensed Year(s): 1979
Summary: To conduct aerial photography to identify possible ice jam areas. To conduct aerial photography to identify alternate pipeline routes. To collect samples of river water for sediment load analysis....


TOTAL PAGES: 1