6 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped): Not seeing the results you want? Tryadvanced search.
Principal Investigator:Marken, Sandra L Licensed Year(s):
2006
Summary:
The objective of the study is to determine: the best access for a drilling and development location on Richards Island, which lakes may be suitable for water withdrawal, and geotechnical baseline conditions along a proposed pipeline corridor, proposed gas conditioning facility location, and possible quarry site.
The bathymetry program will use a portable zodiac and bathymetry equipment to asses...
Principal Investigator:Hammer, Lorne Licensed Year(s):
2006
Summary:
Shell Exploration and Production Company (Shell) is proposing to mobilize the Mobile Offshore Drilling Unit (MODU), Kulluk, from McKinley Bay, Northwest Territories to offshore Alaska, to initiate preparations for an offshore exploration drilling program to be carried out over the next several years. The Kulluk has been inactive and moored in McKinley Bay since 1993. Prior to that, the Kulluk had ...
Principal Investigator:Seligman, Ben Licensed Year(s):
2005
2004 Summary:
Shell Canada Limited will be surveying the river bottom to see if it is practical to use a barge-mounted gas conditioning facility at the Niglintgak Gas Field in the Mackenzie Delta. The researchers will do a bathymetric survey to identify locations that are not wide enough and/or deep enough for barge passage. Bathymetry is the science of measuring water depths and showing the variations in dep...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
Summary:
This project is a continuation of work that began in 2004. The Niglintgak Gas Processing facility may be constructed on a seaworthy barge, transported to a staging site in the Beaufort Sea, and then towed through the Mackenzie Delta channels to a sheltered location in Little Kumak Channel where the barge set-down site is proposed. This study will look at the environmental conditions along the pro...
Principal Investigator:Pyc, Cynthia Licensed Year(s):
2004
Summary:
This bathymetry program will determine water depth information along Reindeer Channel, Ellice Island area, and Ya Ya Lake for the proposed 2005/6 seismic program. Understanding the water depth is a key requirement for determining suitable barge access ar...
Principal Investigator:Graburn, Larry Licensed Year(s):
2004
2003 Summary:
The objective of this program is to carry out aerial reconnaissance and preliminary site investigations, topographical aerial mapping, and surface reconnaissance in the general vicinity of the proposed route for the Mackenzie Gas Project. Aerial reconnai...